IAC logo
IAC Assessment: CM1037
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CM1037
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado School of Mines
Assessment Year 2024
Principal Product Custom sheet metal products
NAICS 332322 - Sheet Metal Work Manufacturing
SIC 3444 - Sheet Metalwork
Sales $5,000,000-$10,000,000
# of Employees 18
Plant Area (Sq.Ft.) 24,000
Annual Production 1,400 Units
Production Hrs. Annual 2,730
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $11,032 257,384 kWh $0.04
Electricity Demand $34,000 1,572 kW-months/year $21.63
Electricity Fees $8,867 - $ -
Natural Gas $6,308 615 MMBtu $10.26
TOTAL ENERGY COSTS $60,206
RECOMMENDED SAVINGS* $40,498 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$12,561
Cost:
$150,694
$6,848 159,762 $5,713 264 - - - - $6,848
159,762
kWh
$5,713
264
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$23,469
Cost:
$472,800
$6,178 144,136 $15,472 715 - - $1,820 - $6,178
144,136
kWh
$15,472
715
kW-months/year
-
-
MMBtu
$1,820
-
$
03: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$1,212
Cost:
$5,526
$302 7,038 $910 42 - - - - $302
7,038
kWh
$910
42
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$223
Cost:
$2,035
$223 5,186 - - - - - - $223
5,186
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$2,886
Cost:
$3,371
$77 1,803 - - $2,809 274 - - $77
1,803
kWh
-
-
kW-months/year
$2,809
274
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$148
Cost:
$250
$40 935 $108 5 - - - - $40
935
kWh
$108
5
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$40,498
Cost:
$634,676
$13,667 318,859 $22,203 1,026 $2,809 274 $1,820 - $13,667
318,859
kWh
$22,203
1,026
kW-months/year
$2,809
274
MMBtu
$1,820
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost