IAC logo
IAC Assessment: CO0089
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0089
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1987
Principal Product AGRICULTURAL EQUIPMENT
NAICS n/a
SIC 3523 - Farm Machinery And Equipment
Sales $10,000,000-$50,000,000
# of Employees 400
Plant Area (Sq.Ft.) 0
Annual Production 5,000 Pieces
Production Hrs. Annual 4,160
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $227,020 7,592,907 kWh $0.03
Natural Gas $376,574 84,204 MMBtu $4.47
TOTAL ENERGY COSTS $603,594
RECOMMENDED SAVINGS* $126,125 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $51,471
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$2,416
Cost:
$21
$42 1,465 $2,374 531 $42
1,465
kWh
$2,374
531
MMBtu
02: 2.2532 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD Savings:
$2,026
Cost:
$150
- - $2,026 453 -
-
kWh
$2,026
453
MMBtu
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$6,537
Cost:
$500
- - $6,537 1,463 -
-
kWh
$6,537
1,463
MMBtu
04: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$8,540
Cost:
$3,000
- - $8,540 1,910 -
-
kWh
$8,540
1,910
MMBtu
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$726
Cost:
$300
- - $726 163 -
-
kWh
$726
163
MMBtu
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$13,198
Cost:
-
- - $13,198 2,953 -
-
kWh
$13,198
2,953
MMBtu
07: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$50,245
Cost:
$180,000
- - $50,245 11,241 -
-
kWh
$50,245
11,241
MMBtu
08: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$19,113
Cost:
$24,000
$(-916) (-30,774) $20,029 4,481 $(-916)
(-30,774)
kWh
$20,029
4,481
MMBtu
09: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$8,911
Cost:
$2,100
- - $8,911 1,994 -
-
kWh
$8,911
1,994
MMBtu
10: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$3,042
Cost:
$7,140
- - $3,042 681 -
-
kWh
$3,042
681
MMBtu
11: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$3,916
Cost:
$13,440
- - $3,916 876 -
-
kWh
$3,916
876
MMBtu
12: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$3,066
Cost:
$750
$3,066 165,006 - - $3,066
165,006
kWh
-
-
MMBtu
13: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,437
Cost:
$1,000
$2,437 81,477 - - $2,437
81,477
kWh
-
-
MMBtu
14: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,473
Cost:
$750
- - $1,473 330 -
-
kWh
$1,473
330
MMBtu
15: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$479
Cost:
$300
$479 16,120 - - $479
16,120
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$126,125
Cost:
$233,451
$5,108 233,294 $121,017 27,076 $5,108
233,294
kWh
$121,017
27,076
MMBtu
TOTAL IMPLEMENTED Savings:
$51,471
Cost:
$27,771
$5,108 233,294 $46,363 10,374 $5,108
233,294
kWh
$46,363
10,374
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas