Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 1988 |
Principal Product | GRAN. SUGAR, CATTLE FEED |
NAICS | n/a |
SIC | 2063 - Beet Sugar |
Sales | $10,000,000-$50,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 0 |
Annual Production | 0 Units |
Production Hrs. Annual | 3,600 |
Location (State) | NE |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $270,780 | 7,305,100 | kWh | $0.04 |
Natural Gas | $39,110 | 8,657 | MMBtu | $4.52 |
Coal | $1,274,834 | 1,098,489 | MMBtu | $1.16 |
TOTAL ENERGY COSTS | $1,584,724 | |||
RECOMMENDED SAVINGS* | $271,238 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $267,848 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Coal | Electricity Usage | Natural Gas | Coal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $151,329 Cost: $7,000 |
- | - | - | - | $151,329 | 140,119 |
- - kWh |
- - MMBtu |
$151,329 140,119 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $753 Cost: $18,000 |
- | - | - | - | $753 | 698 |
- - kWh |
- - MMBtu |
$753 698 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $2,758 Cost: - |
$2,540 | 68,581 | - | - | $218 | 202 |
$2,540 68,581 kWh |
- - MMBtu |
$218 202 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $5,814 Cost: $7,000 |
$5,354 | 144,490 | - | - | $460 | 426 |
$5,354 144,490 kWh |
- - MMBtu |
$460 426 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $3,390 Cost: $375 |
- | - | $3,390 | 750 | - | - |
- - kWh |
$3,390 750 MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $107,194 Cost: $100,000 |
- | - | - | - | $107,194 | 99,254 |
- - kWh |
- - MMBtu |
$107,194 99,254 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $271,238 Cost: $132,375 |
$7,894 | 213,071 | $3,390 | 750 | $259,954 | 240,699 | $7,894 213,071 kWh |
$3,390 750 MMBtu |
$259,954 240,699 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $267,848 Cost: $132,000 |
$7,894 | 213,071 | - | - | $259,954 | 240,699 | $7,894 213,071 kWh |
- - MMBtu |
$259,954 240,699 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Coal | Electricity Usage | Natural Gas | Coal |