IAC Assessment: CO0116
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0116
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1988
Principal Product GRAN. SUGAR, CATTLE FEED
NAICS n/a
SIC 2063 - Beet Sugar
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 3,600
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $270,780 7,305,100 kWh $0.04
Natural Gas $39,110 8,657 MMBtu $4.52
Coal $1,274,834 1,098,489 MMBtu $1.16
TOTAL ENERGY COSTS $1,584,724
RECOMMENDED SAVINGS* $271,238 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $267,848
#|Description Savings
Cost
Status Electricity Usage Natural Gas Coal Electricity Usage Natural Gas Coal
$ kWh $ MMBtu $ MMBtu
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$151,329
Cost:
$7,000
- - - - $151,329 140,119 -
-
kWh
-
-
MMBtu
$151,329
140,119
MMBtu
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$753
Cost:
$18,000
- - - - $753 698 -
-
kWh
-
-
MMBtu
$753
698
MMBtu
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,758
Cost:
-
$2,540 68,581 - - $218 202 $2,540
68,581
kWh
-
-
MMBtu
$218
202
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,814
Cost:
$7,000
$5,354 144,490 - - $460 426 $5,354
144,490
kWh
-
-
MMBtu
$460
426
MMBtu
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$3,390
Cost:
$375
- - $3,390 750 - - -
-
kWh
$3,390
750
MMBtu
-
-
MMBtu
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$107,194
Cost:
$100,000
- - - - $107,194 99,254 -
-
kWh
-
-
MMBtu
$107,194
99,254
MMBtu
TOTAL RECOMMENDED Savings:
$271,238
Cost:
$132,375
$7,894 213,071 $3,390 750 $259,954 240,699 $7,894
213,071
kWh
$3,390
750
MMBtu
$259,954
240,699
MMBtu
TOTAL IMPLEMENTED Savings:
$267,848
Cost:
$132,000
$7,894 213,071 - - $259,954 240,699 $7,894
213,071
kWh
-
-
MMBtu
$259,954
240,699
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Natural Gas Coal Electricity Usage Natural Gas Coal