IAC logo
IAC Assessment: CO0377
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0377
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1996
Principal Product automotive hood protectors
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 145
Plant Area (Sq.Ft.) 53,000
Annual Production 1,092,000 Pieces
Production Hrs. Annual 5,408
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $35,212 2,031,653 kWh $0.02
Electricity Demand $55,393 4,958 kW-months/year $11.17
Electricity Fees $29 - $ -
Natural Gas $8,623 2,222 MMBtu $3.88
TOTAL ENERGY COSTS $100,357
RECOMMENDED SAVINGS* $531,835 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $ $ $
01: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$517,560
Cost:
$5,000
$(-470) (-27,257) $(-670) (-60) - - - - $81,900 - - - $436,800 - $(-470)
(-27,257)
kWh
$(-670)
(-60)
kW-months/year
-
-
MMBtu
-
-
gal
$81,900
-
$
-
-
$
$436,800
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$7,610
Cost:
$50,000
$5,490 317,702 $7,380 661 $(-5,260) (-1,355) - - - - - - - - $5,490
317,702
kWh
$7,380
661
kW-months/year
$(-5,260)
(-1,355)
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$2,810
Cost:
$6,710
$2,810 162,368 - - - - - - - - - - - - $2,810
162,368
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
04: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$1,865
Cost:
$3,550
$(-5) (-293) - - - - $590 220 $500 - $780 - - - $(-5)
(-293)
kWh
-
-
kW-months/year
-
-
MMBtu
$590
220
gal
$500
-
$
$780
-
$
-
-
$
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$850
Cost:
$290
$350 20,223 $500 45 - - - - - - - - - - $350
20,223
kWh
$500
45
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
06: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING Savings:
$840
Cost:
$560
$(-10) (-586) $(-10) (-1) $860 221 - - - - - - - - $(-10)
(-586)
kWh
$(-10)
(-1)
kW-months/year
$860
221
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$300
Cost:
$280
$120 7,034 $180 16 - - - - - - - - - - $120
7,034
kWh
$180
16
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$531,835
Cost:
$66,390
$8,285 479,191 $7,380 661 $(-4,400) (-1,134) $590 220 $82,400 - $780 - $436,800 - $8,285
479,191
kWh
$7,380
661
kW-months/year
$(-4,400)
(-1,134)
MMBtu
$590
220
gal
$82,400
-
$
$780
-
$
$436,800
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Ancillary Material Cost Primary Product