IAC Assessment: CO0407
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0407
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1998
Principal Product innerspring & boxspring mattresses
NAICS n/a
SIC 2515 - Mattresses And Bedsprings
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 71,000
Annual Production 625,000 Pieces
Production Hrs. Annual 8,760
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $82,808 3,222,157 kWh $0.03
Electricity Demand $55,863 12,705 kW-months/year $4.40
Electricity Fees $4,404 - $ -
Natural Gas $58,395 17,040 MMBtu $3.43
TOTAL ENERGY COSTS $214,690
RECOMMENDED SAVINGS* $1,172,230 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,158,130
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Solid Waste (haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Solid Waste (haz) Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ lb $ $ $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$6,210
Cost:
$15,400
- - $6,210 797 - - - - - - - - - - - - -
-
kWh
$6,210
797
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
lb
-
-
$
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$6,170
Cost:
$8,790
- - - - $6,170 1,610 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$6,170
1,610
MMBtu
-
-
gal
-
-
lb
-
-
lb
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,710
Cost:
$240
$1,990 67,409 $720 92 - - - - - - - - - - - - $1,990
67,409
kWh
$720
92
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
lb
-
-
$
-
-
$
04: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$10,420
Cost:
$600
- - - - - - - - $10,420 1,056,000 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$10,420
1,056,000
lb
-
-
lb
-
-
$
-
-
$
05: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$1,380
Cost:
$3,000
$(-170) (-5,862) $(-60) (-8) - - $2,890 220 - - - - - - $(-1,280) - $(-170)
(-5,862)
kWh
$(-60)
(-8)
kW-months/year
-
-
MMBtu
$2,890
220
gal
-
-
lb
-
-
lb
-
-
$
$(-1,280)
-
$
06: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$340
Cost:
-
- - - - - - - - - - $340 70 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$340
70
lb
-
-
$
-
-
$
07: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$1,145,000
Cost:
$210,480
- - - - - - - - - - - - $1,145,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
lb
$1,145,000
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$1,172,230
Cost:
$238,510
$1,820 61,547 $6,870 881 $6,170 1,610 $2,890 220 $10,420 1,056,000 $340 70 $1,145,000 - $(-1,280) - $1,820
61,547
kWh
$6,870
881
kW-months/year
$6,170
1,610
MMBtu
$2,890
220
gal
$10,420
1,056,000
lb
$340
70
lb
$1,145,000
-
$
$(-1,280)
-
$
TOTAL IMPLEMENTED Savings:
$1,158,130
Cost:
$211,320
$1,990 67,409 $720 92 - - - - $10,420 1,056,000 - - $1,145,000 - - - $1,990
67,409
kWh
$720
92
kW-months/year
-
-
MMBtu
-
-
gal
$10,420
1,056,000
lb
-
-
lb
$1,145,000
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Solid Waste (haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Solid Waste (haz) Administrative Changes Ancillary Material Cost