Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 1998 |
Principal Product | asphalt |
NAICS | n/a |
SIC | 2951 - Asphalt Paving Mixtures And Blocks |
Sales | $10,000,000-$50,000,000 |
# of Employees | 320 |
Plant Area (Sq.Ft.) | 30,000 |
Annual Production | 500,000 Tons |
Production Hrs. Annual | 5,200 |
Location (State) | CO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $38,160 | 2,146,249 | kWh | $0.02 |
Electricity Demand | $74,280 | 7,359 | kW-months/year | $10.09 |
Electricity Fees | $(-255) | - | $ | - |
Natural Gas | $226,903 | 80,853 | MMBtu | $2.81 |
TOTAL ENERGY COSTS | $364,528 | |||
RECOMMENDED SAVINGS* | $201,620 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $116,150 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Solid Waste (non-haz) | Ancillary Material Cost | Water Consumption | Primary Product | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Solid Waste (non-haz) | Ancillary Material Cost | Water Consumption | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $8,960 Cost: $5,700 |
$(-530) | (-29,601) | $(-870) | (-81) | $10,360 | 3,579 | - | - | - | - | - | - | - | - | - | - |
$(-530) (-29,601) kWh |
$(-870) (-81) kW-months/year |
$10,360 3,579 MMBtu |
- - gal |
- - lb |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $7,390 Cost: $9,870 |
$3,540 | 196,659 | $3,850 | 266 | - | - | - | - | - | - | - | - | - | - | - | - |
$3,540 196,659 kWh |
$3,850 266 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $9,590 Cost: $25,000 |
$5,450 | 303,048 | $4,140 | 386 | - | - | - | - | - | - | - | - | - | - | - | - |
$5,450 303,048 kWh |
$4,140 386 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $2,420 Cost: $4,303 |
$720 | 39,859 | $1,700 | 159 | - | - | - | - | - | - | - | - | - | - | - | - |
$720 39,859 kWh |
$1,700 159 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS |
Savings: $2,770 Cost: $500 |
- | - | - | - | - | - | - | - | - | - | $2,770 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
$2,770 - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES |
Savings: $2,380 Cost: $6,000 |
$(-470) | (-26,377) | $(-390) | (-36) | - | - | $5,160 | 613 | - | - | $(-1,920) | - | - | - | - | - |
$(-470) (-26,377) kWh |
$(-390) (-36) kW-months/year |
- - MMBtu |
$5,160 613 gal |
- - lb |
$(-1,920) - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.6124 BURN WASTE OIL FOR HEAT |
Savings: $1,620 Cost: $5,420 |
- | - | - | - | $1,180 | 406 | $440 | 2,900 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,180 406 MMBtu |
$440 2,900 gal |
- - lb |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.3122 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS |
Savings: $92,990 Cost: $250,000 |
- | - | - | - | - | - | - | - | $15,050 | 700,000 | - | - | $16,690 | - | $61,250 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$15,050 700,000 lb |
- - $ |
$16,690 - Tgal |
$61,250 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.121 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING |
Savings: $73,500 Cost: $200,000 |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | $73,500 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
- - Tgal |
$73,500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $201,620 Cost: $506,793 |
$8,710 | 483,588 | $8,430 | 694 | $11,540 | 3,985 | $5,600 | 3,513 | $15,050 | 700,000 | $850 | - | $16,690 | - | $134,750 | - | $8,710 483,588 kWh |
$8,430 694 kW-months/year |
$11,540 3,985 MMBtu |
$5,600 3,513 gal |
$15,050 700,000 lb |
$850 - $ |
$16,690 - Tgal |
$134,750 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $116,150 Cost: $275,793 |
$3,730 | 206,917 | $4,680 | 344 | $11,540 | 3,985 | $440 | 2,900 | $15,050 | 700,000 | $2,770 | - | $16,690 | - | $61,250 | - | $3,730 206,917 kWh |
$4,680 344 kW-months/year |
$11,540 3,985 MMBtu |
$440 2,900 gal |
$15,050 700,000 lb |
$2,770 - $ |
$16,690 - Tgal |
$61,250 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Solid Waste (non-haz) | Ancillary Material Cost | Water Consumption | Primary Product | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Solid Waste (non-haz) | Ancillary Material Cost | Water Consumption | Primary Product |