IAC logo
IAC Assessment: CO0426
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0426
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1998
Principal Product asphalt
NAICS n/a
SIC 2951 - Asphalt Paving Mixtures And Blocks
Sales $10,000,000-$50,000,000
# of Employees 320
Plant Area (Sq.Ft.) 30,000
Annual Production 500,000 Tons
Production Hrs. Annual 5,200
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $38,160 2,146,249 kWh $0.02
Electricity Demand $74,280 7,359 kW-months/year $10.09
Electricity Fees $(-255) - $ -
Natural Gas $226,903 80,853 MMBtu $2.81
TOTAL ENERGY COSTS $364,528
RECOMMENDED SAVINGS* $201,620 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $116,150
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost Water Consumption Primary Product Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost Water Consumption Primary Product
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ Tgal $ $
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$8,960
Cost:
$5,700
$(-530) (-29,601) $(-870) (-81) $10,360 3,579 - - - - - - - - - - $(-530)
(-29,601)
kWh
$(-870)
(-81)
kW-months/year
$10,360
3,579
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
Tgal
-
-
$
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$7,390
Cost:
$9,870
$3,540 196,659 $3,850 266 - - - - - - - - - - - - $3,540
196,659
kWh
$3,850
266
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
Tgal
-
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$9,590
Cost:
$25,000
$5,450 303,048 $4,140 386 - - - - - - - - - - - - $5,450
303,048
kWh
$4,140
386
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
Tgal
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,420
Cost:
$4,303
$720 39,859 $1,700 159 - - - - - - - - - - - - $720
39,859
kWh
$1,700
159
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
Tgal
-
-
$
05: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$2,770
Cost:
$500
- - - - - - - - - - $2,770 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$2,770
-
$
-
-
Tgal
-
-
$
06: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$2,380
Cost:
$6,000
$(-470) (-26,377) $(-390) (-36) - - $5,160 613 - - $(-1,920) - - - - - $(-470)
(-26,377)
kWh
$(-390)
(-36)
kW-months/year
-
-
MMBtu
$5,160
613
gal
-
-
lb
$(-1,920)
-
$
-
-
Tgal
-
-
$
07: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$1,620
Cost:
$5,420
- - - - $1,180 406 $440 2,900 - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,180
406
MMBtu
$440
2,900
gal
-
-
lb
-
-
$
-
-
Tgal
-
-
$
08: 3.3122 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS Savings:
$92,990
Cost:
$250,000
- - - - - - - - $15,050 700,000 - - $16,690 - $61,250 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$15,050
700,000
lb
-
-
$
$16,690
-
Tgal
$61,250
-
$
09: 4.121 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING Savings:
$73,500
Cost:
$200,000
- - - - - - - - - - - - - - $73,500 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
Tgal
$73,500
-
$
TOTAL RECOMMENDED Savings:
$201,620
Cost:
$506,793
$8,710 483,588 $8,430 694 $11,540 3,985 $5,600 3,513 $15,050 700,000 $850 - $16,690 - $134,750 - $8,710
483,588
kWh
$8,430
694
kW-months/year
$11,540
3,985
MMBtu
$5,600
3,513
gal
$15,050
700,000
lb
$850
-
$
$16,690
-
Tgal
$134,750
-
$
TOTAL IMPLEMENTED Savings:
$116,150
Cost:
$275,793
$3,730 206,917 $4,680 344 $11,540 3,985 $440 2,900 $15,050 700,000 $2,770 - $16,690 - $61,250 - $3,730
206,917
kWh
$4,680
344
kW-months/year
$11,540
3,985
MMBtu
$440
2,900
gal
$15,050
700,000
lb
$2,770
-
$
$16,690
-
Tgal
$61,250
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost Water Consumption Primary Product Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost Water Consumption Primary Product