IAC logo
IAC Assessment: CO0431
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0431
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1999
Principal Product flavor extracts & herbal products
NAICS n/a
SIC 2833 - Medicinals And Botanicals
Sales $5,000,000-$10,000,000
# of Employees 70
Plant Area (Sq.Ft.) 28,500
Annual Production 24,000 Pounds
Production Hrs. Annual 6,240
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $81,762 2,370,164 kWh $0.03
Electricity Demand $33,663 4,119 kW-months/year $8.17
Electricity Fees $1,054 - $ -
Natural Gas $83,297 16,152 MMBtu $5.16
TOTAL ENERGY COSTS $231,595
RECOMMENDED SAVINGS* $707,050 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $702,330
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Product Increase in Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Product Increase in Production
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $ $ %
01: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$16,420
Cost:
$21,500
$10,750 351,700 $5,670 676 - - - - - - - - - - - - $10,750
351,700
kWh
$5,670
676
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
%
02: 2.1222 INSTALL TURBULATORS Savings:
$1,830
Cost:
$3,630
- - - - $1,830 346 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,830
346
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
%
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,340
Cost:
$610
$880 28,722 $460 55 - - - - - - - - - - - - $880
28,722
kWh
$460
55
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
%
04: 3.1182 MAKE A NEW BY-PRODUCT Savings:
$4,350
Cost:
$19,100
- - - - - - $5,400 200,000 $(-1,050) - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,400
200,000
lb
$(-1,050)
-
$
-
-
$
-
-
$
-
-
%
05: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$370
Cost:
-
- - - - - - $370 - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$370
-
lb
-
-
$
-
-
$
-
-
$
-
-
%
06: 4.114 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS Savings:
$638,100
Cost:
-
- - - - - - - - - - $60,600 - - - $577,500 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$60,600
-
$
-
-
$
$577,500
-
%
07: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$44,640
Cost:
-
- - - - - - - - $(-86,400) - - - $131,040 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$(-86,400)
-
$
-
-
$
$131,040
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$707,050
Cost:
$44,840
$11,630 380,422 $6,130 731 $1,830 346 $5,770 200,000 $(-87,450) - $60,600 - $131,040 - $577,500 - $11,630
380,422
kWh
$6,130
731
kW-months/year
$1,830
346
MMBtu
$5,770
200,000
lb
$(-87,450)
-
$
$60,600
-
$
$131,040
-
$
$577,500
-
%
TOTAL IMPLEMENTED Savings:
$702,330
Cost:
$25,740
$11,630 380,422 $6,130 731 $1,830 346 - - $(-86,400) - $60,600 - $131,040 - $577,500 - $11,630
380,422
kWh
$6,130
731
kW-months/year
$1,830
346
MMBtu
-
-
lb
$(-86,400)
-
$
$60,600
-
$
$131,040
-
$
$577,500
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $ $ %
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Product Increase in Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Product Increase in Production