IAC logo
IAC Assessment: CO0434
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0434
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1999
Principal Product IV transfusion apparatus and disposable plastic components
NAICS n/a
SIC 3842 - Surgical Appliances And Supplies
Sales $10,000,000-$50,000,000
# of Employees 190
Plant Area (Sq.Ft.) 54,580
Annual Production 40,000,000 Pieces
Production Hrs. Annual 4,420
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $14,229 793,962 kWh $0.02
Electricity Demand $26,934 1,966 kW-months/year $13.70
Electricity Fees $204 - $ -
Natural Gas $10,044 2,291 MMBtu $4.38
TOTAL ENERGY COSTS $59,314
RECOMMENDED SAVINGS* $104,810 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Personnel Changes Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
01: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$1,340
Cost:
$100
$10 293 - - $1,330 315 - - - - - - - - $10
293
kWh
-
-
kW-months/year
$1,330
315
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$490
Cost:
$710
$90 4,982 $490 36 $(-90) (-22) - - - - - - - - $90
4,982
kWh
$490
36
kW-months/year
$(-90)
(-22)
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$480
Cost:
$1,400
$20 1,172 - - $460 108 - - - - - - - - $20
1,172
kWh
-
-
kW-months/year
$460
108
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
04: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$380
Cost:
$60
- - - - - - $440 155 - - $(-60) - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$440
155
lb
-
-
$
$(-60)
-
$
-
-
$
05: 3.1163 USE PLASTIC PALLETS INSTEAD OF WOOD Savings:
$230
Cost:
$610
- - - - - - - - - - $230 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$230
-
$
-
-
$
06: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$96,720
Cost:
$20,000
- - - - - - - - - - - - $96,720 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
$96,720
-
$
07: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$5,170
Cost:
$10,000
- - - - - - - - $5,170 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$5,170
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$104,810
Cost:
$32,880
$120 6,447 $490 36 $1,700 401 $440 155 $5,170 - $170 - $96,720 - $120
6,447
kWh
$490
36
kW-months/year
$1,700
401
MMBtu
$440
155
lb
$5,170
-
$
$170
-
$
$96,720
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Personnel Changes Ancillary Material Cost Primary Product