IAC Assessment: CO0445
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0445
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 1999
Principal Product bindrs and folders for paper and cassettes
NAICS n/a
SIC 2782 - Blankbooks And Looseleaf Binders
Sales $1,000,000-$5,000,000
# of Employees 50
Plant Area (Sq.Ft.) 23,300
Annual Production 1,200,000 Pieces
Production Hrs. Annual 2,236
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $8,997 318,875 kWh $0.03
Electricity Demand $12,446 892 kW-months/year $13.95
Electricity Fees $756 - $ -
Natural Gas $8,880 1,824 MMBtu $4.87
TOTAL ENERGY COSTS $33,887
RECOMMENDED SAVINGS* $53,850 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,390
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ MMBtu $ lb $ lb $ $ $ $ $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$5,830
Cost:
-
$1,080 59,496 $4,750 343 - - - - - - - - - - - - $1,080
59,496
kWh
$4,750
343
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,570
Cost:
$1,000
$440 24,033 $1,910 138 - - - - - - $(-780) - - - - - $440
24,033
kWh
$1,910
138
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
$(-780)
-
$
-
-
$
-
-
$
03: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE Savings:
$820
Cost:
$1,000
- - - - $820 189 - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$820
189
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$680
Cost:
-
$160 8,499 $520 38 - - - - - - - - - - - - $160
8,499
kWh
$520
38
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$450
Cost:
$380
$100 5,569 $350 25 - - - - - - - - - - - - $100
5,569
kWh
$350
25
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
06: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$360
Cost:
-
- - - - - - $360 - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$360
-
lb
-
-
lb
-
-
$
-
-
$
-
-
$
07: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$140
Cost:
-
- - - - - - - - $160 56 - - $(-20) - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$160
56
lb
-
-
$
$(-20)
-
$
-
-
$
08: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$44,000
Cost:
$1,400
- - - - - - - - - - - - - - $44,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
$44,000
-
$
TOTAL RECOMMENDED Savings:
$53,850
Cost:
$3,780
$1,780 97,597 $7,530 544 $820 189 $360 - $160 56 $(-780) - $(-20) - $44,000 - $1,780
97,597
kWh
$7,530
544
kW-months/year
$820
189
MMBtu
$360
-
lb
$160
56
lb
$(-780)
-
$
$(-20)
-
$
$44,000
-
$
TOTAL IMPLEMENTED Savings:
$2,390
Cost:
$2,000
$440 24,033 $1,910 138 $820 189 - - - - $(-780) - - - - - $440
24,033
kWh
$1,910
138
kW-months/year
$820
189
MMBtu
-
-
lb
-
-
lb
$(-780)
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Personnel Changes Ancillary Material Cost Primary Product