IAC Assessment: CO0486
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0486
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2001
Principal Product refined petroleum products
NAICS n/a
SIC 2911 - Petroleum Refining
Sales $100,000,000-$500,000,000
# of Employees 218
Plant Area (Sq.Ft.) 3,920,000
Annual Production 17,600,000 BBL
Production Hrs. Annual 8,760
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,013,947 99,597,600 kWh $0.02
Electricity Demand $981,835 171,087 kW-months/year $5.74
Electricity Fees $1,210 - $ -
Natural Gas $2,822,095 634,925 MMBtu $4.44
TOTAL ENERGY COSTS $5,819,087
RECOMMENDED SAVINGS* $441,460 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$298,800
Cost:
$962,500
$(-151,500) (-6,937,000) $(-58,700) (-9,503) $434,000 97,790 $75,000 - $(-151,500)
(-6,937,000)
kWh
$(-58,700)
(-9,503)
kW-months/year
$434,000
97,790
MMBtu
$75,000
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$105,800
Cost:
$28,000
- - - - $105,800 23,840 - - -
-
kWh
-
-
kW-months/year
$105,800
23,840
MMBtu
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$22,640
Cost:
$68,400
- - $22,640 3,664 - - - - -
-
kWh
$22,640
3,664
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4234 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER Savings:
$7,590
Cost:
$10,000
- - - - $7,590 1,711 - - -
-
kWh
-
-
kW-months/year
$7,590
1,711
MMBtu
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,140
Cost:
$21,600
$4,140 189,600 - - - - - - $4,140
189,600
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,490
Cost:
$6,000
- - - - $2,490 562 - - -
-
kWh
-
-
kW-months/year
$2,490
562
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$441,460
Cost:
$1,096,500
$(-147,360) (-6,747,400) $(-36,060) (-5,839) $549,880 123,903 $75,000 - $(-147,360)
(-6,747,400)
kWh
$(-36,060)
(-5,839)
kW-months/year
$549,880
123,903
MMBtu
$75,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes