IAC Assessment: CO0515
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0515
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2002
Principal Product gold
NAICS 212221 - Gold Ore Mining
SIC 1041 - Gold Ores
Sales >$500,000,000
# of Employees 1,700
Plant Area (Sq.Ft.) 200,000
Annual Production 146,341 Pounds
Production Hrs. Annual 8,760
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $56,135,414 1,044,341,439 kWh $0.05
Electricity Demand $7,825,177 2,209,688 kW-months/year $3.54
Electricity Fees $1,592,977 - $ -
LPG $9,835,981 2,052,434 MMBtu $4.79
Fuel Oil #2 $16,806,213 2,849,064 MMBtu $5.90
Other Energy $460,928 43,363 MMBtu $10.63
TOTAL ENERGY COSTS $92,661,690
RECOMMENDED SAVINGS* $7,111,490 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $334,040
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Other Liquid (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand LPG Other Liquid (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $
01: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$167,740
Cost:
$45,000
$134,330 2,604,800 $33,410 3,581 - - - - - - - - $134,330
2,604,800
kWh
$33,410
3,581
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$66,100
Cost:
$24,160
$71,840 1,393,300 $17,810 1,909 - - - - $(-23,550) - - - $71,840
1,393,300
kWh
$17,810
1,909
kW-months/year
-
-
MMBtu
-
-
gal
$(-23,550)
-
$
-
-
$
03: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$50,000
Cost:
$26,000
- - - - - - - - $50,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$50,000
-
$
-
-
$
04: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$50,200
Cost:
$4,800
- - - - - - - - $50,200 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$50,200
-
$
-
-
$
05: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$34,520
Cost:
$18,000
- - - - $29,520 5,556 $5,000 50,000 - - - - -
-
kWh
-
-
kW-months/year
$29,520
5,556
MMBtu
$5,000
50,000
gal
-
-
$
-
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$241,800
Cost:
$105,900
$193,780 3,757,600 $48,020 5,147 - - - - - - - - $193,780
3,757,600
kWh
$48,020
5,147
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$187,930
Cost:
$102,500
- - - - $187,930 35,366 - - - - - - -
-
kWh
-
-
kW-months/year
$187,930
35,366
MMBtu
-
-
gal
-
-
$
-
-
$
08: 2.9121 INSTALL WIND POWERED ELECTRIC GENERATOR Savings:
$6,313,200
Cost:
$48,000,000
$5,421,040 105,120,000 - - - - - - - - $892,160 - $5,421,040
105,120,000
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
$892,160
-
$
TOTAL RECOMMENDED Savings:
$7,111,490
Cost:
$48,326,360
$5,820,990 112,875,700 $99,240 10,637 $217,450 40,922 $5,000 50,000 $76,650 - $892,160 - $5,820,990
112,875,700
kWh
$99,240
10,637
kW-months/year
$217,450
40,922
MMBtu
$5,000
50,000
gal
$76,650
-
$
$892,160
-
$
TOTAL IMPLEMENTED Savings:
$334,040
Cost:
$99,960
$206,170 3,998,100 $51,220 5,490 - - - - $76,650 - - - $206,170
3,998,100
kWh
$51,220
5,490
kW-months/year
-
-
MMBtu
-
-
gal
$76,650
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $
Electricity Usage Electricity Demand LPG Other Liquid (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand LPG Other Liquid (non-haz) Personnel Changes Administrative Changes