Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Colorado State University |
---|---|
Assessment Year | 2006 |
Principal Product | Breakfast cereals |
NAICS | 311230 - Breakfast Cereal Manufacturing |
SIC | 2043 - Cereal Breakfast Foods |
Sales | <$500,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 176,100 |
Annual Production | 13,000,000 Pieces |
Production Hrs. Annual | 8,760 |
Location (State) | NM |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,015,524 | 26,820,000 | kWh | $0.04 |
Electricity Demand | $493,447 | 50,734 | kW-months/year | $9.73 |
Electricity Fees | $68,434 | - | $ | - |
Natural Gas | $1,494,479 | 149,959 | MMBtu | $9.97 |
TOTAL ENERGY COSTS | $3,071,884 | |||
RECOMMENDED SAVINGS* | $371,480 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $81,490 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT |
Savings: $264,540 Cost: $1,173,000 |
$186,670 | 4,943,300 | $77,870 | 7,128 | - | - | - | - |
$186,670 4,943,300 kWh |
$77,870 7,128 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2692 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER |
Savings: $56,580 Cost: $570 |
$40,430 | 1,079,000 | $16,150 | 1,478 | - | - | - | - |
$40,430 1,079,000 kWh |
$16,150 1,478 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $950 Cost: $500 |
- | - | - | - | $950 | 96 | - | - |
- - kWh |
- - kW-months/year |
$950 96 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT |
Savings: $23,960 Cost: - |
$17,120 | 456,800 | $6,840 | 626 | - | - | - | - |
$17,120 456,800 kWh |
$6,840 626 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7252 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM |
Savings: $21,540 Cost: $100,800 |
$11,050 | 322,600 | $10,490 | 960 | - | - | - | - |
$11,050 322,600 kWh |
$10,490 960 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $3,910 Cost: $32,600 |
$1,100 | 23,000 | $870 | 80 | - | - | $1,940 | - |
$1,100 23,000 kWh |
$870 80 kW-months/year |
- - MMBtu |
$1,940 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $371,480 Cost: $1,307,470 |
$256,370 | 6,824,700 | $112,220 | 10,272 | $950 | 96 | $1,940 | - | $256,370 6,824,700 kWh |
$112,220 10,272 kW-months/year |
$950 96 MMBtu |
$1,940 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $81,490 Cost: $1,070 |
$57,550 | 1,535,800 | $22,990 | 2,104 | $950 | 96 | - | - | $57,550 1,535,800 kWh |
$22,990 2,104 kW-months/year |
$950 96 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes |