IAC logo
IAC Assessment: CO0675
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0675
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2013
Principal Product Diamond cutting wire
NAICS 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471 - Plating And Polishing
Sales $10,000,000-$50,000,000
# of Employees 145
Plant Area (Sq.Ft.) 132,000
Annual Production 50,000 Pieces
Production Hrs. Annual 8,760
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $152,497 5,209,729 kWh $0.03
Electricity Demand $164,375 8,825 kW-months/year $18.63
Electricity Fees $6,843 - $ -
Natural Gas $79,085 9,679 MMBtu $8.17
TOTAL ENERGY COSTS $402,800
RECOMMENDED SAVINGS* $41,060 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $270
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7252 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM Savings:
$30,250
Cost:
$172,320
$10,180 319,200 $20,070 1,135 - - - - - - $10,180
319,200
kWh
$20,070
1,135
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$9,730
Cost:
$18,100
- - - - $9,730 1,239 - - - - -
-
kWh
-
-
kW-months/year
$9,730
1,239
MMBtu
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$810
Cost:
$1,280
$570 26,400 - - - - $170 - $70 - $570
26,400
kWh
-
-
kW-months/year
-
-
MMBtu
$170
-
$
$70
-
$
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$270
Cost:
$290
- - - - $270 34 - - - - -
-
kWh
-
-
kW-months/year
$270
34
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$41,060
Cost:
$191,990
$10,750 345,600 $20,070 1,135 $10,000 1,273 $170 - $70 - $10,750
345,600
kWh
$20,070
1,135
kW-months/year
$10,000
1,273
MMBtu
$170
-
$
$70
-
$
TOTAL IMPLEMENTED Savings:
$270
Cost:
$290
- - - - $270 34 - - - - -
-
kWh
-
-
kW-months/year
$270
34
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost