IAC logo
IAC Assessment: CO0684
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CO0684
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Colorado State University
Assessment Year 2014
Principal Product Food Products
NAICS 311999 - All Other Miscellaneous Food Manufacturing
SIC 2099 - Food Preparations, Nec
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 81,800
Annual Production 3,000,000 Pieces
Production Hrs. Annual 7,300
Location (State) CO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $132,991 3,110,080 kWh $0.04
Electricity Demand $135,578 6,412 kW-months/year $21.14
Electricity Fees $1,224 - $ -
Natural Gas $59,541 9,223 MMBtu $6.46
TOTAL ENERGY COSTS $329,334
RECOMMENDED SAVINGS* $41,230 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,790
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,830
Cost:
$3,600
$3,420 76,700 - - $(-1,590) (-256) - - $3,420
76,700
kWh
-
-
kW-months/year
$(-1,590)
(-256)
MMBtu
-
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$920
Cost:
$2,600
$2,550 57,300 - - $(-1,630) (-224) - - $2,550
57,300
kWh
-
-
kW-months/year
$(-1,630)
(-224)
MMBtu
-
-
$
03: 2.7252 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM Savings:
$28,690
Cost:
$96,370
$12,790 287,000 $15,900 749 - - - - $12,790
287,000
kWh
$15,900
749
kW-months/year
-
-
MMBtu
-
-
$
04: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$9,790
Cost:
$1,500
- - - - - - $9,790 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$9,790
-
$
TOTAL RECOMMENDED Savings:
$41,230
Cost:
$104,070
$18,760 421,000 $15,900 749 $(-3,220) (-480) $9,790 - $18,760
421,000
kWh
$15,900
749
kW-months/year
$(-3,220)
(-480)
MMBtu
$9,790
-
$
TOTAL IMPLEMENTED Savings:
$9,790
Cost:
$1,500
- - - - - - $9,790 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$9,790
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $