Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Delaware |
---|---|
Assessment Year | 2009 |
Principal Product | brush |
NAICS | 339994 - Broom, Brush, and Mop Manufacturing |
SIC | 3991 - Brooms And Brushes |
Sales | <$500,000 |
# of Employees | 79 |
Plant Area (Sq.Ft.) | 150,000 |
Annual Production | 3,800,000 Pieces |
Production Hrs. Annual | 2,125 |
Location (State) | MD |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $141,447 | 1,207,681 | kWh | $0.12 |
Fuel Oil #2 | $10,627 | 526 | MMBtu | $20.20 |
Other Gas | $18,389 | 942 | MMBtu | $19.52 |
TOTAL ENERGY COSTS | $170,463 | |||
RECOMMENDED SAVINGS* | $59,858 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $4,827 |
#|Description |
Savings Cost |
Status | Electricity Usage | Fuel Oil #2 | Other Gas | Electricity Usage | Fuel Oil #2 | Other Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING |
Savings: $26,142 Cost: $14,000 |
- | - | $9,411 | 480 | $16,731 | 860 |
- - kWh |
$9,411 480 MMBtu |
$16,731 860 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $16,987 Cost: $18,000 |
$16,987 | 139,230 | - | - | - | - |
$16,987 139,230 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $5,802 Cost: $4,000 |
$5,802 | 47,557 | - | - | - | - |
$5,802 47,557 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $4,127 Cost: $1,430 |
- | - | $4,127 | 143 | - | - |
- - kWh |
$4,127 143 MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $4,231 Cost: - |
$4,231 | 34,677 | - | - | - | - |
$4,231 34,677 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $596 Cost: - |
$596 | 4,880 | - | - | - | - |
$596 4,880 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $231 Cost: $594 |
$231 | 1,890 | - | - | - | - |
$231 1,890 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $1,742 Cost: $10,500 |
$(-287) | (-2,352) | - | - | $2,029 | 104 |
$(-287) (-2,352) kWh |
- - MMBtu |
$2,029 104 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $59,858 Cost: $48,524 |
$27,560 | 225,882 | $13,538 | 623 | $18,760 | 964 | $27,560 225,882 kWh |
$13,538 623 MMBtu |
$18,760 964 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $4,827 Cost: - |
$4,827 | 39,557 | - | - | - | - | $4,827 39,557 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Fuel Oil #2 | Other Gas | Electricity Usage | Fuel Oil #2 | Other Gas |