IAC logo
IAC Assessment: DL0036
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0036
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2009
Principal Product brush
NAICS 339994 - Broom, Brush, and Mop Manufacturing
SIC 3991 - Brooms And Brushes
Sales <$500,000
# of Employees 79
Plant Area (Sq.Ft.) 150,000
Annual Production 3,800,000 Pieces
Production Hrs. Annual 2,125
Location (State) MD
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $141,447 1,207,681 kWh $0.12
Fuel Oil #2 $10,627 526 MMBtu $20.20
Other Gas $18,389 942 MMBtu $19.52
TOTAL ENERGY COSTS $170,463
RECOMMENDED SAVINGS* $59,858 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,827
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Other Gas Electricity Usage Fuel Oil #2 Other Gas
$ kWh $ MMBtu $ MMBtu
01: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING Savings:
$26,142
Cost:
$14,000
- - $9,411 480 $16,731 860 -
-
kWh
$9,411
480
MMBtu
$16,731
860
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$16,987
Cost:
$18,000
$16,987 139,230 - - - - $16,987
139,230
kWh
-
-
MMBtu
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,802
Cost:
$4,000
$5,802 47,557 - - - - $5,802
47,557
kWh
-
-
MMBtu
-
-
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,127
Cost:
$1,430
- - $4,127 143 - - -
-
kWh
$4,127
143
MMBtu
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,231
Cost:
-
$4,231 34,677 - - - - $4,231
34,677
kWh
-
-
MMBtu
-
-
MMBtu
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$596
Cost:
-
$596 4,880 - - - - $596
4,880
kWh
-
-
MMBtu
-
-
MMBtu
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$231
Cost:
$594
$231 1,890 - - - - $231
1,890
kWh
-
-
MMBtu
-
-
MMBtu
08: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$1,742
Cost:
$10,500
$(-287) (-2,352) - - $2,029 104 $(-287)
(-2,352)
kWh
-
-
MMBtu
$2,029
104
MMBtu
TOTAL RECOMMENDED Savings:
$59,858
Cost:
$48,524
$27,560 225,882 $13,538 623 $18,760 964 $27,560
225,882
kWh
$13,538
623
MMBtu
$18,760
964
MMBtu
TOTAL IMPLEMENTED Savings:
$4,827
Cost:
-
$4,827 39,557 - - - - $4,827
39,557
kWh
-
-
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Fuel Oil #2 Other Gas Electricity Usage Fuel Oil #2 Other Gas