Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Delaware |
---|---|
Assessment Year | 2011 |
Principal Product | molten metal |
NAICS | 331511 - Iron Foundries |
SIC | 3322 - Malleable Iron Foundries |
Sales | <$500,000 |
# of Employees | 320 |
Plant Area (Sq.Ft.) | 220,000 |
Annual Production | 1,500 Units |
Production Hrs. Annual | 4,420 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $2,103,604 | 27,450,000 | kWh | $0.08 |
LPG | $412,430 | 18,970 | MMBtu | $21.74 |
TOTAL ENERGY COSTS | $2,516,035 | |||
RECOMMENDED SAVINGS* | $342,800 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $132,600 |
#|Description |
Savings Cost |
Status | Electricity Usage | LPG | Electricity Usage | LPG | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7314 REDUCE VENTILATION AIR |
Savings: $96,600 Cost: $149,350 |
- | - | $96,600 | 4,450 |
- - kWh |
$96,600 4,450 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING |
Savings: $36,000 Cost: $1,000 |
- | - | $36,000 | 1,660 |
- - kWh |
$36,000 1,660 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $18,000 Cost: $11,000 |
$18,000 | 234,000 | - | - |
$18,000 234,000 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2514 COVER OPEN TANKS |
Savings: $36,600 Cost: $9,390 |
- | - | $36,600 | 1,680 |
- - kWh |
$36,600 1,680 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $60,000 Cost: $30,000 |
- | - | $60,000 | 2,760 |
- - kWh |
$60,000 2,760 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $95,600 Cost: $21,215 |
- | - | $95,600 | 4,400 |
- - kWh |
$95,600 4,400 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $342,800 Cost: $221,955 |
$18,000 | 234,000 | $324,800 | 14,950 | $18,000 234,000 kWh |
$324,800 14,950 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $132,600 Cost: $150,350 |
- | - | $132,600 | 6,110 | - - kWh |
$132,600 6,110 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | LPG | Electricity Usage | LPG |