IAC logo
IAC Assessment: DL0080
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0080
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2012
Principal Product corrugated containers
NAICS 322130 - Paperboard Mills
SIC 2631 - Paperboard Mills
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 156,800
Annual Production 387,000 Units
Production Hrs. Annual 5,840
Location (State) MD
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $264,000 3,200,000 kWh $0.08
Electricity Demand $30,628 11,099 kW-months/year $2.76
Electricity Fees $71,000 - $ -
Natural Gas $156,866 22,732 MMBtu $6.90
TOTAL ENERGY COSTS $522,494
RECOMMENDED SAVINGS* $64,915 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,980
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,088
Cost:
$100
$3,088 26,850 - - $3,088
26,850
kWh
-
-
MMBtu
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$15,456
Cost:
$26,650
$15,456 134,400 - - $15,456
134,400
kWh
-
-
MMBtu
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$14,835
Cost:
$380
$14,835 129,000 - - $14,835
129,000
kWh
-
-
MMBtu
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,451
Cost:
$2,160
$4,451 38,700 - - $4,451
38,700
kWh
-
-
MMBtu
05: 3.8131 USE WATER-BASED ADHESIVES Savings:
$7,845
Cost:
$145
- - $7,845 1,137 -
-
kWh
$7,845
1,137
MMBtu
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$3,140
Cost:
$10,000
- - $3,140 455 -
-
kWh
$3,140
455
MMBtu
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$8,500
Cost:
$112
- - $8,500 848 -
-
kWh
$8,500
848
MMBtu
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,400
Cost:
$287
$1,400 12,200 - - $1,400
12,200
kWh
-
-
MMBtu
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$6,200
Cost:
$121
$6,200 54,000 - - $6,200
54,000
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$64,915
Cost:
$39,955
$45,430 395,150 $19,485 2,440 $45,430
395,150
kWh
$19,485
2,440
MMBtu
TOTAL IMPLEMENTED Savings:
$33,980
Cost:
$39,055
$22,995 199,950 $10,985 1,592 $22,995
199,950
kWh
$10,985
1,592
MMBtu
Savings
Cost
$ kWh $ MMBtu