IAC Assessment: DL0095
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0095
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2012
Principal Product corrugated containers
NAICS 322211 - Corrugated and Solid Fiber Box Manufacturing
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $50,000,000-$100,000,000
# of Employees 105
Plant Area (Sq.Ft.) 90,000
Annual Production 612,000 Thousand Feet
Production Hrs. Annual 6,240
Location (State) MD
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $348,593 6,376,610 kWh $0.05
Electricity Demand $98,129 12,952 kW-months/year $7.58
Natural Gas $420,968 65,624 MMBtu $6.41
TOTAL ENERGY COSTS $867,690
RECOMMENDED SAVINGS* $58,456 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,056
Cost:
$700
$4,056 57,943 - - $4,056
57,943
kWh
-
-
MMBtu
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$6,024
Cost:
$600
- - $6,024 1,046 -
-
kWh
$6,024
1,046
MMBtu
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$9,524
Cost:
$28,000
$14,717 210,240 $(-5,192) (-897) $14,717
210,240
kWh
$(-5,192)
(-897)
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$19,942
Cost:
$13,697
$19,942 284,887 - - $19,942
284,887
kWh
-
-
MMBtu
05: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$18,910
Cost:
$6,300
- - $18,910 3,283 -
-
kWh
$18,910
3,283
MMBtu
TOTAL RECOMMENDED Savings:
$58,456
Cost:
$49,297
$38,715 553,070 $19,742 3,432 $38,715
553,070
kWh
$19,742
3,432
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas