Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Delaware |
---|---|
Assessment Year | 2013 |
Principal Product | PTFE Powders |
NAICS | 326199 - All Other Plastics Product Manufacturing |
SIC | 3089 - Plastics Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 27 |
Plant Area (Sq.Ft.) | 43,900 |
Annual Production | 1,530,000 Pounds |
Production Hrs. Annual | 2,000 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $149,831 | 2,433,501 | kWh | $0.06 |
Electricity Demand | $25,383 | 7,986 | kW-months/year | $3.18 |
Electricity Fees | $18,080 | - | $ | - |
Natural Gas | $112,681 | 23,763 | MMBtu | $4.74 |
TOTAL ENERGY COSTS | $431,975 | |||
RECOMMENDED SAVINGS* | $247,485 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $55,806 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Electricity Usage | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $39,709 Cost: - |
$7,677 | 123,818 | $32,032 | 6,756 |
$7,677 123,818 kWh |
$32,032 6,756 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6122 ADJUST VENTS TO MINIMIZE ENERGY USE |
Savings: $3,279 Cost: - |
$795 | 10,065 | $2,484 | 524 |
$795 10,065 kWh |
$2,484 524 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $13,367 Cost: - |
$5,120 | 71,100 | $8,247 | 1,740 |
$5,120 71,100 kWh |
$8,247 1,740 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $1,687 Cost: $270 |
- | - | $1,687 | 356 |
- - kWh |
$1,687 356 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $500 Cost: $200 |
$200 | 3,100 | $300 | 66 |
$200 3,100 kWh |
$300 66 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR |
Savings: $2,400 Cost: $400 |
- | - | $2,400 | 498 |
- - kWh |
$2,400 498 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE |
Savings: $543 Cost: - |
$543 | 8,766 | - | - |
$543 8,766 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES |
Savings: $186,000 Cost: $500,000 |
$99,500 | 1,260,000 | $86,500 | 18,256 |
$99,500 1,260,000 kWh |
$86,500 18,256 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $247,485 Cost: $500,870 |
$113,835 | 1,476,849 | $133,650 | 28,196 | $113,835 1,476,849 kWh |
$133,650 28,196 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $55,806 Cost: $470 |
$13,540 | 206,784 | $42,266 | 8,918 | $13,540 206,784 kWh |
$42,266 8,918 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Electricity Usage | Natural Gas |