IAC logo
IAC Assessment: DL0108
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0108
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2013
Principal Product PTFE Powders
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 27
Plant Area (Sq.Ft.) 43,900
Annual Production 1,530,000 Pounds
Production Hrs. Annual 2,000
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $149,831 2,433,501 kWh $0.06
Electricity Demand $25,383 7,986 kW-months/year $3.18
Electricity Fees $18,080 - $ -
Natural Gas $112,681 23,763 MMBtu $4.74
TOTAL ENERGY COSTS $431,975
RECOMMENDED SAVINGS* $247,485 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $55,806
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$39,709
Cost:
-
$7,677 123,818 $32,032 6,756 $7,677
123,818
kWh
$32,032
6,756
MMBtu
02: 2.6122 ADJUST VENTS TO MINIMIZE ENERGY USE Savings:
$3,279
Cost:
-
$795 10,065 $2,484 524 $795
10,065
kWh
$2,484
524
MMBtu
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$13,367
Cost:
-
$5,120 71,100 $8,247 1,740 $5,120
71,100
kWh
$8,247
1,740
MMBtu
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,687
Cost:
$270
- - $1,687 356 -
-
kWh
$1,687
356
MMBtu
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$500
Cost:
$200
$200 3,100 $300 66 $200
3,100
kWh
$300
66
MMBtu
06: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$2,400
Cost:
$400
- - $2,400 498 -
-
kWh
$2,400
498
MMBtu
07: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$543
Cost:
-
$543 8,766 - - $543
8,766
kWh
-
-
MMBtu
08: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$186,000
Cost:
$500,000
$99,500 1,260,000 $86,500 18,256 $99,500
1,260,000
kWh
$86,500
18,256
MMBtu
TOTAL RECOMMENDED Savings:
$247,485
Cost:
$500,870
$113,835 1,476,849 $133,650 28,196 $113,835
1,476,849
kWh
$133,650
28,196
MMBtu
TOTAL IMPLEMENTED Savings:
$55,806
Cost:
$470
$13,540 206,784 $42,266 8,918 $13,540
206,784
kWh
$42,266
8,918
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas