IAC logo
IAC Assessment: DL0143
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0143
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2015
Principal Product Cellulosic Sugar
NAICS 325110 - Petrochemical Manufacturing
SIC 2869 - Industrial Organic Chemicals, Nec
Sales $1,000,000-$5,000,000
# of Employees 45
Plant Area (Sq.Ft.) 40,000
Annual Production 100,000 Tons
Production Hrs. Annual 3,640
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $78,421 930,048 kWh $0.08
Electricity Demand $21,745 3,029 kW-months/year $7.18
Electricity Fees $2,070 - $ -
Natural Gas $39,455 4,427 MMBtu $8.91
TOTAL ENERGY COSTS $141,691
RECOMMENDED SAVINGS* $22,821 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,335
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7314 REDUCE VENTILATION AIR Savings:
$12,970
Cost:
-
$7,980 95,000 $4,990 560 $7,980
95,000
kWh
$4,990
560
MMBtu
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,928
Cost:
-
$1,928 22,950 - - $1,928
22,950
kWh
-
-
MMBtu
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,030
Cost:
$1,000
$1,030 12,280 - - $1,030
12,280
kWh
-
-
MMBtu
04: 2.7311 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE Savings:
$1,988
Cost:
-
$428 5,090 $1,560 175 $428
5,090
kWh
$1,560
175
MMBtu
05: 2.7311 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE Savings:
$2,468
Cost:
$200
$482 5,730 $1,986 223 $482
5,730
kWh
$1,986
223
MMBtu
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,582
Cost:
$3,000
- - $1,582 177 -
-
kWh
$1,582
177
MMBtu
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$855
Cost:
-
- - $855 96 -
-
kWh
$855
96
MMBtu
TOTAL RECOMMENDED Savings:
$22,821
Cost:
$4,200
$11,848 141,050 $10,973 1,231 $11,848
141,050
kWh
$10,973
1,231
MMBtu
TOTAL IMPLEMENTED Savings:
$17,335
Cost:
$3,000
$9,908 117,950 $7,427 833 $9,908
117,950
kWh
$7,427
833
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas