IAC Assessment: DL0152
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0152
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2015
Principal Product EPDM Rubber Membranes
NAICS 324122 - Asphalt Shingle and Coating Materials Manufacturing
SIC 2952 - Asphalt Felts And Coatings
Sales $100,000,000-$500,000,000
# of Employees 250
Plant Area (Sq.Ft.) 350,000
Annual Production 393,000 Thousand Feet
Production Hrs. Annual 6,600
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,072,735 32,032,000 kWh $0.06
Electricity Demand $103,806 29,555 kW-months/year $3.51
Natural Gas $310,063 50,845 MMBtu $6.10
TOTAL ENERGY COSTS $2,536,628
RECOMMENDED SAVINGS* $198,990 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $118,160
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$49,150
Cost:
$85,250
$(-13,330) (-205,150) $(-1,570) (-448) $64,050 10,500 $(-13,330)
(-205,150)
kWh
$(-1,570)
(-448)
kW-months/year
$64,050
10,500
MMBtu
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$9,300
Cost:
$34,100
- - - - $9,300 1,525 -
-
kWh
-
-
kW-months/year
$9,300
1,525
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$18,290
Cost:
$69,750
$18,290 281,400 - - - - $18,290
281,400
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$42,330
Cost:
$164,300
$39,000 600,000 $3,330 948 - - $39,000
600,000
kWh
$3,330
948
kW-months/year
-
-
MMBtu
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$8,400
Cost:
$46,500
$6,050 93,060 $2,350 670 - - $6,050
93,060
kWh
$2,350
670
kW-months/year
-
-
MMBtu
06: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$13,980
Cost:
$92,000
$13,980 215,150 - - - - $13,980
215,150
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$57,540
Cost:
$1,325,000
$57,540 885,200 - - - - $57,540
885,200
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$198,990
Cost:
$1,816,900
$121,530 1,869,660 $4,110 1,170 $73,350 12,025 $121,530
1,869,660
kWh
$4,110
1,170
kW-months/year
$73,350
12,025
MMBtu
TOTAL IMPLEMENTED Savings:
$118,160
Cost:
$1,559,050
$114,830 1,766,600 $3,330 948 - - $114,830
1,766,600
kWh
$3,330
948
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas