Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2016
Principal Product Glass Bottles
NAICS 327213 - Glass Container Manufacturing
SIC 3221 - Glass Containers
Sales $100,000,000-$500,000,000
# of Employees 300
Plant Area (Sq.Ft.) 230,000
Annual Production 500,000,000 Units
Production Hrs. Annual 8,760
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $6,006,605 61,054,379 kWh $0.10
Natural Gas $3,027,745 753,405 MMBtu $4.02
TOTAL ENERGY COSTS $9,034,350
RECOMMENDED SAVINGS* $610,440 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,120
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2427 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS Savings:
$163,600
Cost:
$12,000
- - $163,600 40,700 -
-
kWh
$163,600
40,700
MMBtu
02: 2.6125 KEEP EQUIPMENT CLEAN Savings:
$13,120
Cost:
$2,500
- - $13,120 3,260 -
-
kWh
$13,120
3,260
MMBtu
03: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$117,000
Cost:
$34,000
- - $117,000 29,100 -
-
kWh
$117,000
29,100
MMBtu
04: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$5,060
Cost:
$5,000
- - $5,060 1,260 -
-
kWh
$5,060
1,260
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$11,160
Cost:
$11,160
- - $11,160 2,720 -
-
kWh
$11,160
2,720
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$300,500
Cost:
$1,937,040
$300,500 3,066,000 - - $300,500
3,066,000
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$610,440
Cost:
$2,001,700
$300,500 3,066,000 $309,940 77,040 $300,500
3,066,000
kWh
$309,940
77,040
MMBtu
TOTAL IMPLEMENTED Savings:
$13,120
Cost:
$2,500
- - $13,120 3,260 -
-
kWh
$13,120
3,260
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas