Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Delaware |
---|---|
Assessment Year | 2023 |
Principal Product | Cardboard boxes |
NAICS | 322219 - Other Paperboard Container Manufacturing |
SIC | 2652 - Setup Paperboard Boxes |
Sales | $10,000,000-$50,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 320,000 |
Annual Production | 183,000 Thousand Feet |
Production Hrs. Annual | 8,568 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $549,661 | 10,545,492 | kWh | $0.05 |
Electricity Demand | $124,109 | 22,646 | kW-months/year | $5.48 |
Electricity Fees | $4,383 | - | $ | - |
Natural Gas | $642,441 | 88,392 | MMBtu | $7.27 |
TOTAL ENERGY COSTS | $1,320,594 | |||
RECOMMENDED SAVINGS* | $128,717 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $117,252 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7314 REDUCE VENTILATION AIR |
Savings: $11,809 Cost: - |
$665 | 12,784 | $153 | 28 | $10,991 | 1,512 |
$665 12,784 kWh |
$153 28 kW-months/year |
$10,991 1,512 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $90,882 Cost: - |
$49,731 | 956,352 | $11,476 | 2,094 | $29,675 | 4,082 |
$49,731 956,352 kWh |
$11,476 2,094 kW-months/year |
$29,675 4,082 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR |
Savings: $3,402 Cost: $750 |
- | - | - | - | $3,402 | 468 |
- - kWh |
- - kW-months/year |
$3,402 468 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2691 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS |
Savings: $10,992 Cost: $10,000 |
- | - | - | - | $10,992 | 1,512 |
- - kWh |
- - kW-months/year |
$10,992 1,512 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $11,159 Cost: $10,000 |
- | - | - | - | $11,159 | 1,535 |
- - kWh |
- - kW-months/year |
$11,159 1,535 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $473 Cost: $1,000 |
- | - | - | - | $473 | 65 |
- - kWh |
- - kW-months/year |
$473 65 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $128,717 Cost: $21,750 |
$50,395 | 969,136 | $11,630 | 2,122 | $66,692 | 9,174 | $50,395 969,136 kWh |
$11,630 2,122 kW-months/year |
$66,692 9,174 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $117,252 Cost: $10,750 |
$50,395 | 969,136 | $11,630 | 2,122 | $55,227 | 7,597 | $50,395 969,136 kWh |
$11,630 2,122 kW-months/year |
$55,227 7,597 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |