IAC logo
IAC Assessment: DL0223
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0223
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2023
Principal Product Carbonated beverages
NAICS 312111 - Soft Drink Manufacturing
SIC 2086 - Bottled And Canned Soft Drinks
Sales $50,000,000-$100,000,000
# of Employees 90
Plant Area (Sq.Ft.) 100,000
Annual Production 30,607 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) MD
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $241,977 4,646,411 kWh $0.05
Electricity Demand $36,061 9,590 kW-months/year $3.76
Electricity Fees $4,457 - $ -
Natural Gas $79,726 17,644 MMBtu $4.52
TOTAL ENERGY COSTS $3,445,562
RECOMMENDED SAVINGS* $514,182 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,456
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Gaseous Waste Electricity Usage Electricity Demand Gaseous Waste
$ kWh $ kW-months/year $ lb
01: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$9,025
Cost:
-
$7,821 150,400 $1,204 320 - - $7,821
150,400
kWh
$1,204
320
kW-months/year
-
-
lb
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,437
Cost:
$1,030
$1,246 23,955 $191 51 - - $1,246
23,955
kWh
$191
51
kW-months/year
-
-
lb
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,840
Cost:
$2,800
$8,528 163,992 $1,312 348 - - $8,528
163,992
kWh
$1,312
348
kW-months/year
-
-
lb
04: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN Savings:
$994
Cost:
$4,800
$862 16,568 $132 35 - - $862
16,568
kWh
$132
35
kW-months/year
-
-
lb
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$490,980
Cost:
$10,000
- - - - $490,980 6,137,253 -
-
kWh
-
-
kW-months/year
$490,980
6,137,253
lb
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,906
Cost:
$7,955
$1,650 31,773 $256 68 - - $1,650
31,773
kWh
$256
68
kW-months/year
-
-
lb
TOTAL RECOMMENDED Savings:
$514,182
Cost:
$26,585
$20,107 386,688 $3,095 822 $490,980 6,137,253 $20,107
386,688
kWh
$3,095
822
kW-months/year
$490,980
6,137,253
lb
TOTAL IMPLEMENTED Savings:
$11,456
Cost:
$5,830
$9,929 190,923 $1,527 406 - - $9,929
190,923
kWh
$1,527
406
kW-months/year
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ lb
Electricity Usage Electricity Demand Gaseous Waste Electricity Usage Electricity Demand Gaseous Waste