Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Delaware |
---|---|
Assessment Year | 2023 |
Principal Product | Canned soft drinks |
NAICS | 312111 - Soft Drink Manufacturing |
SIC | 2086 - Bottled And Canned Soft Drinks |
Sales | $100,000,000-$500,000,000 |
# of Employees | 62 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 27,000 Thousand Gallons |
Production Hrs. Annual | 7,956 |
Location (State) | NJ |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $584,514 | 4,717,046 | kWh | $0.12 |
Electricity Demand | $74,502 | 10,708 | kW-months/year | $6.96 |
Electricity Fees | $4,450 | - | $ | - |
Natural Gas | $166,751 | 16,861 | MMBtu | $9.89 |
TOTAL ENERGY COSTS | $830,217 | |||
RECOMMENDED SAVINGS* | $98,479 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $12,303 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Usage | Electricity Usage | Natural Gas | Water Usage | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.4152 CAREFULLY CONTROL WATER LEVEL IN MASS FINISHING EQUIPMENT |
Savings: $4,024 Cost: $700 |
- | - | - | - | $4,024 | 477 |
- - kWh |
- - MMBtu |
$4,024 477 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $8,279 Cost: - |
$8,279 | 59,133 | - | - | - | - |
$8,279 59,133 kWh |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $13,322 Cost: $37,499 |
$13,322 | 95,154 | - | - | - | - |
$13,322 95,154 kWh |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2426 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR |
Savings: $3,115 Cost: $4,102 |
- | - | $3,115 | 315 | - | - |
- - kWh |
$3,115 315 MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $22,512 Cost: $73,200 |
$22,512 | 160,800 | - | - | - | - |
$22,512 160,800 kWh |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $47,227 Cost: $350 |
$47,227 | 337,334 | - | - | - | - |
$47,227 337,334 kWh |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $98,479 Cost: $115,851 |
$91,340 | 652,421 | $3,115 | 315 | $4,024 | 477 | $91,340 652,421 kWh |
$3,115 315 MMBtu |
$4,024 477 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $12,303 Cost: $700 |
$8,279 | 59,133 | - | - | $4,024 | 477 | $8,279 59,133 kWh |
- - MMBtu |
$4,024 477 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Usage | Electricity Usage | Natural Gas | Water Usage |