IAC logo
IAC Assessment: DL0230
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0230
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2024
Principal Product Waffles
NAICS 311230 - Breakfast Cereal Manufacturing
SIC 2043 - Cereal Breakfast Foods
Sales $10,000,000-$50,000,000
# of Employees 55
Plant Area (Sq.Ft.) 101,000
Annual Production 150,000,000 Units
Production Hrs. Annual 8,760
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $872,813 8,619,910 kWh $0.10
Electricity Demand $230,164 22,499 kW-months/year $10.23
Electricity Fees $13,286 - $ -
Natural Gas $604,280 43,983 MMBtu $13.74
TOTAL ENERGY COSTS $1,720,543
RECOMMENDED SAVINGS* $192,376 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$13,779
Cost:
$15,504
$13,779 107,650 - - $13,779
107,650
kWh
-
-
MMBtu
02: 2.7273 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM Savings:
$44,058
Cost:
$22,437
$38,933 304,162 $5,125 373 $38,933
304,162
kWh
$5,125
373
MMBtu
03: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$100,915
Cost:
$74,000
$100,915 788,400 - - $100,915
788,400
kWh
-
-
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,146
Cost:
$2,040
- - $3,146 229 -
-
kWh
$3,146
229
MMBtu
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$11,418
Cost:
-
$11,418 89,203 - - $11,418
89,203
kWh
-
-
MMBtu
06: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$15,141
Cost:
$10,000
- - $15,141 1,102 -
-
kWh
$15,141
1,102
MMBtu
07: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$3,919
Cost:
$2,200
$3,919 30,616 - - $3,919
30,616
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$192,376
Cost:
$126,181
$168,964 1,320,031 $23,412 1,704 $168,964
1,320,031
kWh
$23,412
1,704
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas