IAC logo
IAC Assessment: DL0250
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0250
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2025
Principal Product Asphalt
NAICS 324121 - Asphalt Paving Mixture and Block Manufacturing
SIC 2951 - Asphalt Paving Mixtures And Blocks
Sales $10,000,000-$50,000,000
# of Employees 30
Plant Area (Sq.Ft.) 16,000
Annual Production 900,000 Tons
Production Hrs. Annual 4,181
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $240,950 1,512,314 kWh $0.16
Electricity Demand $33,657 6,747 kW-months/year $4.99
Electricity Fees $4,450 - $ -
Natural Gas $573,950 114,790 MMBtu $5.00
TOTAL ENERGY COSTS $853,007
RECOMMENDED SAVINGS* $147,048 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$5,277
Cost:
$4,500
$4,610 28,995 $667 134 - - $4,610
28,995
kWh
$667
134
kW-months/year
-
-
MMBtu
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$42,985
Cost:
$31,000
$37,554 236,190 $5,431 1,088 - - $37,554
236,190
kWh
$5,431
1,088
kW-months/year
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$25,468
Cost:
$16,000
$22,250 139,935 $3,218 645 - - $22,250
139,935
kWh
$3,218
645
kW-months/year
-
-
MMBtu
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$50,005
Cost:
$5,100
- - - - $50,005 10,001 -
-
kWh
-
-
kW-months/year
$50,005
10,001
MMBtu
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$4,948
Cost:
$18,000
$4,323 27,186 $625 125 - - $4,323
27,186
kWh
$625
125
kW-months/year
-
-
MMBtu
06: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$18,365
Cost:
$50,000
- - - - $18,365 3,673 -
-
kWh
-
-
kW-months/year
$18,365
3,673
MMBtu
TOTAL RECOMMENDED Savings:
$147,048
Cost:
$124,600
$68,737 432,306 $9,941 1,992 $68,370 13,674 $68,737
432,306
kWh
$9,941
1,992
kW-months/year
$68,370
13,674
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas