IAC logo
IAC Assessment: DL0252
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0252
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2025
Principal Product Roasted Coffee
NAICS 311920 - Coffee and Tea Manufacturing
SIC 2095 - Roasted Coffee
Sales <$500,000
# of Employees 140
Plant Area (Sq.Ft.) 98,000
Annual Production 35,000 Pounds
Production Hrs. Annual 8,400
Location (State) NJ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $333,519 2,719,435 kWh $0.12
Electricity Demand $33,595 6,485 kW-months/year $5.18
Electricity Fees $4,462 - $ -
Natural Gas $307,006 48,490 MMBtu $6.33
TOTAL ENERGY COSTS $678,582
RECOMMENDED SAVINGS* $74,447 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$2,602
Cost:
-
$2,371 19,280 $231 45 - - $2,371
19,280
kWh
$231
45
kW-months/year
-
-
MMBtu
02: 2.7314 REDUCE VENTILATION AIR Savings:
$4,684
Cost:
$1,500
- - - - $4,684 740 -
-
kWh
-
-
kW-months/year
$4,684
740
MMBtu
03: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$28,847
Cost:
$27,000
$4,956 40,294 $483 93 $23,408 3,698 $4,956
40,294
kWh
$483
93
kW-months/year
$23,408
3,698
MMBtu
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$8,172
Cost:
$9,000
- - - - $8,172 1,291 -
-
kWh
-
-
kW-months/year
$8,172
1,291
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$15,540
Cost:
$1,500
$14,160 115,122 $1,380 266 - - $14,160
115,122
kWh
$1,380
266
kW-months/year
-
-
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$13,945
Cost:
$9,000
$12,708 103,320 $1,237 239 - - $12,708
103,320
kWh
$1,237
239
kW-months/year
-
-
MMBtu
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$657
Cost:
$1,000
$620 5,040 $37 7 - - $620
5,040
kWh
$37
7
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$74,447
Cost:
$49,000
$34,815 283,056 $3,368 650 $36,264 5,729 $34,815
283,056
kWh
$3,368
650
kW-months/year
$36,264
5,729
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas