IAC Assessment: DL0256
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0256
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2025
Principal Product chromatography columns
NAICS 332812 - Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479 - Metal Coating And Allied Services
Sales $1,000,000-$5,000,000
# of Employees 42
Plant Area (Sq.Ft.) 23,000
Annual Production 20,000 Units
Production Hrs. Annual 3,300
Location (State) DE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $226,858 2,001,497 kWh $0.11
TOTAL ENERGY COSTS $226,858
RECOMMENDED SAVINGS* $56,801 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,286
Cost:
-
$1,286 11,376 $1,286
11,376
kWh
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,828
Cost:
$5,900
$2,828 25,023 $2,828
25,023
kWh
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$2,894
Cost:
$5,000
$2,894 25,608 $2,894
25,608
kWh
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$16,477
Cost:
$10,000
$16,477 145,815 $16,477
145,815
kWh
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,171
Cost:
$16,500
$6,171 54,613 $6,171
54,613
kWh
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$589
Cost:
$3,250
$589 5,214 $589
5,214
kWh
07: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$1,219
Cost:
$5,200
$1,219 10,789 $1,219
10,789
kWh
08: 2.7234 USE HEAT PUMP FOR SPACE CONDITIONING Savings:
$25,337
Cost:
$50,000
$25,337 224,218 $25,337
224,218
kWh
TOTAL RECOMMENDED Savings:
$56,801
Cost:
$95,850
$56,801 502,656 $56,801
502,656
kWh
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - -
-
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage