IAC logo
IAC Assessment: DL0258
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0258
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2025
Principal Product Injection Molded Plastic Parts
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 40,000
Annual Production 500,000 Units
Production Hrs. Annual 6,206
Location (State) DE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $148,674 1,634,667 kWh $0.09
Electricity Demand $29,523 4,004 kW-months/year $7.37
Electricity Fees $2,934 - $ -
Natural Gas $11,135 1,047 MMBtu $10.64
Other Gas $980 1 MMBtu $980.00
TOTAL ENERGY COSTS $193,246
RECOMMENDED SAVINGS* $22,587 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,112
Cost:
$5,500
$2,112 23,211 - - $2,112
23,211
kWh
-
-
kW-months/year
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,808
Cost:
$25,000
$12,808 140,745 - - $12,808
140,745
kWh
-
-
kW-months/year
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,102
Cost:
$3,500
$4,589 50,436 $513 70 $4,589
50,436
kWh
$513
70
kW-months/year
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,565
Cost:
$200
$2,565 28,190 - - $2,565
28,190
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$22,587
Cost:
$34,200
$22,074 242,582 $513 70 $22,074
242,582
kWh
$513
70
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand