IAC logo
IAC Assessment: DS0063
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0063
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1996
Principal Product Roof & Floor Trusses and wooden boxes & crates
NAICS n/a
SIC 3523 - Farm Machinery And Equipment
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 189,750
Annual Production 115,000 Pieces
Production Hrs. Annual 5,824
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $30,428 977,726 kWh $0.03
Electricity Demand $27,365 4,092 kW-months/year $6.69
Electricity Fees $3,633 - $ -
Natural Gas $25,010 7,636 MMBtu $3.28
TOTAL ENERGY COSTS $87,804
RECOMMENDED SAVINGS* $10,672 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,301
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,301
Cost:
$400
$778 46,307 $523 78 - - - - $778
46,307
kWh
$523
78
kW-months/year
-
-
MMBtu
-
-
lb
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$4,215
Cost:
$600
- - - - $4,215 1,285 - - -
-
kWh
-
-
kW-months/year
$4,215
1,285
MMBtu
-
-
lb
03: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$1,305
Cost:
$4,750
- - - - - - $1,305 14,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,305
14,000
lb
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,851
Cost:
$20,100
$2,567 82,649 $1,284 192 - - - - $2,567
82,649
kWh
$1,284
192
kW-months/year
-
-
MMBtu
-
-
lb
TOTAL RECOMMENDED Savings:
$10,672
Cost:
$25,850
$3,345 128,956 $1,807 270 $4,215 1,285 $1,305 14,000 $3,345
128,956
kWh
$1,807
270
kW-months/year
$4,215
1,285
MMBtu
$1,305
14,000
lb
TOTAL IMPLEMENTED Savings:
$1,301
Cost:
$400
$778 46,307 $523 78 - - - - $778
46,307
kWh
$523
78
kW-months/year
-
-
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)