IAC logo
IAC Assessment: DS0064
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0064
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1996
Principal Product Brushless / AC-DC Motors
NAICS n/a
SIC 3278 -
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 21,465
Annual Production 430,600 Pieces
Production Hrs. Annual 3,047
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $37,894 1,222,743 kWh $0.03
Electricity Demand $28,507 3,767 kW-months/year $7.57
Electricity Fees $2,659 - $ -
Natural Gas $1,988 362 MMBtu $5.49
TOTAL ENERGY COSTS $76,179
RECOMMENDED SAVINGS* $11,867 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,754
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (haz)
$ kWh $ kW-months/year $ MMBtu $ gal
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$2,343
Cost:
$2,500
$5,795 186,987 $331 50 $(-3,783) (-689) - - $5,795
186,987
kWh
$331
50
kW-months/year
$(-3,783)
(-689)
MMBtu
-
-
gal
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,273
Cost:
$600
$707 22,860 - - $566 103 - - $707
22,860
kWh
-
-
kW-months/year
$566
103
MMBtu
-
-
gal
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,299
Cost:
$1,675
$1,299 41,911 - - - - - - $1,299
41,911
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$471
Cost:
$225
$398 12,896 $73 10 - - - - $398
12,896
kWh
$73
10
kW-months/year
-
-
MMBtu
-
-
gal
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,059
Cost:
$220
$886 28,722 $173 23 - - - - $886
28,722
kWh
$173
23
kW-months/year
-
-
MMBtu
-
-
gal
06: 3.8211 CONVERT TO AQUEOUS CLEANING SYSTEM Savings:
$5,422
Cost:
-
$1,723 55,686 $1,354 179 - - $2,345 550 $1,723
55,686
kWh
$1,354
179
kW-months/year
-
-
MMBtu
$2,345
550
gal
TOTAL RECOMMENDED Savings:
$11,867
Cost:
$5,220
$10,808 349,062 $1,931 262 $(-3,217) (-586) $2,345 550 $10,808
349,062
kWh
$1,931
262
kW-months/year
$(-3,217)
(-586)
MMBtu
$2,345
550
gal
TOTAL IMPLEMENTED Savings:
$7,754
Cost:
$820
$3,316 107,268 $1,527 202 $566 103 $2,345 550 $3,316
107,268
kWh
$1,527
202
kW-months/year
$566
103
MMBtu
$2,345
550
gal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (haz)