IAC logo
IAC Assessment: DS0066
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0066
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1996
Principal Product Commercial Printing
NAICS n/a
SIC 2759 - Commercial Printing, Nec
Sales $100,000,000-$500,000,000
# of Employees 475
Plant Area (Sq.Ft.) 385,000
Annual Production 144,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $753,529 27,139,215 kWh $0.03
Electricity Demand $342,289 51,204 kW-months/year $6.68
Electricity Fees $138,698 - $ -
Natural Gas $123,638 82,267 MMBtu $1.50
LPG $9,559 2,595 MMBtu $3.68
TOTAL ENERGY COSTS $1,386,867
RECOMMENDED SAVINGS* $79,710 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $50,372
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$21,792
Cost:
$21,193
$14,938 533,705 $6,854 1,026 - - - - $14,938
533,705
kWh
$6,854
1,026
kW-months/year
-
-
MMBtu
-
-
Tgal
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$27,874
Cost:
$37,150
$25,400 907,386 $(-745) (-112) $3,219 2,146 - - $25,400
907,386
kWh
$(-745)
(-112)
kW-months/year
$3,219
2,146
MMBtu
-
-
Tgal
03: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$28,580
Cost:
$52,000
$(-258) (-9,379) $(-120) (-18) $28,958 19,305 - - $(-258)
(-9,379)
kWh
$(-120)
(-18)
kW-months/year
$28,958
19,305
MMBtu
-
-
Tgal
04: 3.4155 METER WASTE WATER Savings:
$1,464
Cost:
$550
- - - - - - $1,464 492,888 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,464
492,888
Tgal
TOTAL RECOMMENDED Savings:
$79,710
Cost:
$110,893
$40,080 1,431,712 $5,989 896 $32,177 21,451 $1,464 492,888 $40,080
1,431,712
kWh
$5,989
896
kW-months/year
$32,177
21,451
MMBtu
$1,464
492,888
Tgal
TOTAL IMPLEMENTED Savings:
$50,372
Cost:
$73,193
$14,680 524,326 $6,734 1,008 $28,958 19,305 - - $14,680
524,326
kWh
$6,734
1,008
kW-months/year
$28,958
19,305
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal