Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | South Dakota State |
---|---|
Assessment Year | 1997 |
Principal Product | Direct Mail Decks |
NAICS | n/a |
SIC | 2752 - Commercial Printing, Lithographic |
Sales | $10,000,000-$50,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 112,000 |
Annual Production | 75,000,000 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | MN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $142,222 | 4,599,062 | kWh | $0.03 |
Electricity Demand | $80,971 | 11,016 | kW-months/year | $7.35 |
Electricity Fees | $5,799 | - | $ | - |
Natural Gas | $39,740 | 8,836 | MMBtu | $4.50 |
TOTAL ENERGY COSTS | $274,805 | |||
RECOMMENDED SAVINGS* | $162,328 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $150,388 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Other Liquid (haz) | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | gal | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,568 Cost: $775 |
$2,087 | 67,409 | $481 | 60 | - | - | - | - | - | - | - | - | - | - |
$2,087 67,409 kWh |
$481 60 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $8,121 Cost: $17,000 |
- | - | - | - | $8,121 | 1,805 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$8,121 1,805 MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.6124 BURN WASTE OIL FOR HEAT |
Savings: $1,528 Cost: $2,250 |
$(-18) | (-586) | $(-29) | (-1) | $1,575 | 350 | - | - | - | - | - | - | - | - |
$(-18) (-586) kWh |
$(-29) (-1) kW-months/year |
$1,575 350 MMBtu |
- - Tgal |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE |
Savings: $2,193 Cost: $6,000 |
$(-97) | (-3,224) | $(-289) | (-36) | - | - | - | - | $1,083 | 836 | - | - | $1,496 | - |
$(-97) (-3,224) kWh |
$(-289) (-36) kW-months/year |
- - MMBtu |
- - Tgal |
$1,083 836 gal |
- - $ |
$1,496 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) |
Savings: $98 Cost: $275 |
- | - | - | - | - | - | $98 | 56,575 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$98 56,575 Tgal |
- - gal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.2176 INCREASE USE OF AUTOMATION |
Savings: $147,820 Cost: $160,000 |
$(-205) | (-6,741) | $(-135) | (-17) | - | - | - | - | - | - | $148,160 | - | - | - |
$(-205) (-6,741) kWh |
$(-135) (-17) kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
$148,160 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $162,328 Cost: $186,300 |
$1,767 | 56,858 | $28 | 6 | $9,696 | 2,155 | $98 | 56,575 | $1,083 | 836 | $148,160 | - | $1,496 | - | $1,767 56,858 kWh |
$28 6 kW-months/year |
$9,696 2,155 MMBtu |
$98 56,575 Tgal |
$1,083 836 gal |
$148,160 - $ |
$1,496 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $150,388 Cost: $160,775 |
$1,882 | 60,668 | $346 | 43 | - | - | - | - | - | - | $148,160 | - | - | - | $1,882 60,668 kWh |
$346 43 kW-months/year |
- - MMBtu |
- - Tgal |
- - gal |
$148,160 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||