IAC logo
IAC Assessment: DS0091
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0091
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1997
Principal Product Cheese and Whey Products
NAICS n/a
SIC 2022 - Cheese, Natural And Processed
Sales $10,000,000-$50,000,000
# of Employees 172
Plant Area (Sq.Ft.) 111,320
Annual Production 180,522,120 Pounds
Production Hrs. Annual 8,760
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $313,872 18,976,847 kWh $0.02
Electricity Demand $209,698 31,392 kW-months/year $6.68
Electricity Fees $600 - $ -
Natural Gas $517,013 211,048 MMBtu $2.45
LPG $109,250 21,850 MMBtu $5.00
TOTAL ENERGY COSTS $1,161,271
RECOMMENDED SAVINGS* $199,504 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $196,074
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$886
Cost:
$900
$886 52,169 - - - - - - - - $886
52,169
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,234
Cost:
$882
- - - - $3,234 1,315 - - - - -
-
kWh
-
-
kW-months/year
$3,234
1,315
MMBtu
-
-
lb
-
-
$
03: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR Savings:
$121,380
Cost:
$250,000
$6,632 390,094 $(-1,764) (-264) $116,512 47,363 - - - - $6,632
390,094
kWh
$(-1,764)
(-264)
kW-months/year
$116,512
47,363
MMBtu
-
-
lb
-
-
$
04: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$760
Cost:
$800
- - - - - - $760 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$760
-
lb
-
-
$
05: 3.3133 USE OTHER WASTE CONCENTRATION METHODS Savings:
$1,784
Cost:
$10,000
- - - - - - $1,784 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,784
-
lb
-
-
$
06: 2.8212 REDUCE DELIVERY SCHEDULES Savings:
$71,460
Cost:
$50,000
- - - - - - - - $71,460 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$71,460
-
$
TOTAL RECOMMENDED Savings:
$199,504
Cost:
$312,582
$7,518 442,263 $(-1,764) (-264) $119,746 48,678 $2,544 - $71,460 - $7,518
442,263
kWh
$(-1,764)
(-264)
kW-months/year
$119,746
48,678
MMBtu
$2,544
-
lb
$71,460
-
$
TOTAL IMPLEMENTED Savings:
$196,074
Cost:
$300,882
$6,632 390,094 $(-1,764) (-264) $119,746 48,678 - - $71,460 - $6,632
390,094
kWh
$(-1,764)
(-264)
kW-months/year
$119,746
48,678
MMBtu
-
-
lb
$71,460
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes