IAC Assessment: DS0093
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0093
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1997
Principal Product Injection Molded Products
NAICS n/a
SIC 3312 - Blast Furnaces And Steel Mills
Sales $1,000,000-$5,000,000
# of Employees 60
Plant Area (Sq.Ft.) 20,400
Annual Production 625,000 Pounds
Production Hrs. Annual 6,240
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $49,887 1,576,788 kWh $0.03
Electricity Demand $25,328 3,563 kW-months/year $7.11
Electricity Fees $1,225 - $ -
Natural Gas $4,433 798 MMBtu $5.56
TOTAL ENERGY COSTS $130,926
RECOMMENDED SAVINGS* $43,670 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $42,569
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ $ $ lb $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$802
Cost:
$1,500
- - - - $802 - - - - - -
-
kWh
-
-
kW-months/year
$802
-
$
-
-
lb
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$431
Cost:
$24
$431 13,482 - - - - - - - - $431
13,482
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$250
Cost:
$500
$206 6,448 $44 6 - - - - - - $206
6,448
kWh
$44
6
kW-months/year
-
-
$
-
-
lb
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$308
Cost:
$76
$255 7,913 $53 7 - - - - - - $255
7,913
kWh
$53
7
kW-months/year
-
-
$
-
-
lb
-
-
$
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$851
Cost:
$4,500
- - - - - - $851 23,800 - - -
-
kWh
-
-
kW-months/year
-
-
$
$851
23,800
lb
-
-
$
06: 3.5215 AVOID CONTAMINATION OF END PIECES AND REUSE AS FEED STOCK Savings:
$37,008
Cost:
$11,176
- - - - - - $37,008 49,421 - - -
-
kWh
-
-
kW-months/year
-
-
$
$37,008
49,421
lb
-
-
$
07: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$4,020
Cost:
$1,016
- - - - - - - - $4,020 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
$4,020
-
$
TOTAL RECOMMENDED Savings:
$43,670
Cost:
$18,792
$892 27,843 $97 13 $802 - $37,859 73,221 $4,020 - $892
27,843
kWh
$97
13
kW-months/year
$802
-
$
$37,859
73,221
lb
$4,020
-
$
TOTAL IMPLEMENTED Savings:
$42,569
Cost:
$13,792
$686 21,395 $53 7 $802 - $37,008 49,421 $4,020 - $686
21,395
kWh
$53
7
kW-months/year
$802
-
$
$37,008
49,421
lb
$4,020
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Administrative Changes