IAC Assessment: DS0096
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0096
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1997
Principal Product Magazines
NAICS n/a
SIC 2579 -
Sales $50,000,000-$100,000,000
# of Employees 543
Plant Area (Sq.Ft.) 310,000
Annual Production 100,000,000 Pieces
Production Hrs. Annual 8,344
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $555,379 17,719,227 kWh $0.03
Electricity Demand $248,009 39,408 kW-months/year $6.29
Electricity Fees $2,610 - $ -
Natural Gas $130,685 48,618 MMBtu $2.69
LPG $28,562 5,738 MMBtu $4.98
TOTAL ENERGY COSTS $992,890
RECOMMENDED SAVINGS* $124,045 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $84,930
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $ $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$14,674
Cost:
$50,000
- - - - $14,674 5,167 - - - - - - - - -
-
kWh
-
-
kW-months/year
$14,674
5,167
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$23,816
Cost:
$30,000
$16,811 542,497 $7,005 1,114 - - - - - - - - - - $16,811
542,497
kWh
$7,005
1,114
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
-
-
$
03: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$625
Cost:
$100
- - - - - - - - - - $625 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
$625
-
$
-
-
$
04: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$3,938
Cost:
$500
- - - - - - $2,700 660 - - - - $1,238 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,700
660
gal
-
-
$
-
-
$
$1,238
-
$
05: 3.2176 INCREASE USE OF AUTOMATION Savings:
$80,992
Cost:
$100,000
- - - - - - - - $80,992 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$80,992
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$124,045
Cost:
$180,600
$16,811 542,497 $7,005 1,114 $14,674 5,167 $2,700 660 $80,992 - $625 - $1,238 - $16,811
542,497
kWh
$7,005
1,114
kW-months/year
$14,674
5,167
MMBtu
$2,700
660
gal
$80,992
-
$
$625
-
$
$1,238
-
$
TOTAL IMPLEMENTED Savings:
$84,930
Cost:
$100,500
- - - - - - $2,700 660 $80,992 - - - $1,238 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,700
660
gal
$80,992
-
$
-
-
$
$1,238
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Administrative Changes Primary Raw Material