IAC Assessment: DS0099
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0099
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1997
Principal Product Food Processing Equipment
NAICS n/a
SIC 3556 - Food Products Machinery
Sales $10,000,000-$50,000,000
# of Employees 126
Plant Area (Sq.Ft.) 120,000
Annual Production 16 Pieces
Production Hrs. Annual 2,600
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $73,230 2,256,741 kWh $0.03
Electricity Demand $41,557 5,508 kW-months/year $7.54
Electricity Fees $2,402 - $ -
Natural Gas $21,361 3,597 MMBtu $5.94
TOTAL ENERGY COSTS $140,681
RECOMMENDED SAVINGS* $19,500 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,526
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$389
Cost:
$750
$253 7,913 $136 18 - - - - - - $253
7,913
kWh
$136
18
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,032
Cost:
$135
$670 21,102 $362 48 - - - - - - $670
21,102
kWh
$362
48
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.6232 INSTALL SET-BACK TIMERS Savings:
$7,453
Cost:
$4,500
$3,460 108,148 - - $3,993 738 - - - - $3,460
108,148
kWh
-
-
kW-months/year
$3,993
738
MMBtu
-
-
Tgal
-
-
$
04: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$1,231
Cost:
$700
- - - - - - $1,231 1,337,394 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,231
1,337,394
Tgal
-
-
$
05: 4.211 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$5,810
Cost:
$3,267
- - - - - - - - $5,810 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$5,810
-
$
06: 4.211 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$3,585
Cost:
$6,840
- - - - - - - - $3,585 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$3,585
-
$
TOTAL RECOMMENDED Savings:
$19,500
Cost:
$16,192
$4,383 137,163 $498 66 $3,993 738 $1,231 1,337,394 $9,395 - $4,383
137,163
kWh
$498
66
kW-months/year
$3,993
738
MMBtu
$1,231
1,337,394
Tgal
$9,395
-
$
TOTAL IMPLEMENTED Savings:
$15,526
Cost:
$8,602
$4,130 129,250 $362 48 $3,993 738 $1,231 1,337,394 $5,810 - $4,130
129,250
kWh
$362
48
kW-months/year
$3,993
738
MMBtu
$1,231
1,337,394
Tgal
$5,810
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost