IAC logo
IAC Assessment: DS0114
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0114
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1998
Principal Product Stationary and Transport Tanks
NAICS n/a
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $10,000,000-$50,000,000
# of Employees 67
Plant Area (Sq.Ft.) 40,744
Annual Production 19,760 Pieces
Production Hrs. Annual 7,332
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $38,287 1,156,213 kWh $0.03
Electricity Demand $14,643 1,788 kW-months/year $8.19
Electricity Fees $1,544 - $ -
Natural Gas $16,889 3,205 MMBtu $5.27
LPG $10,738 1,046 MMBtu $10.27
Fuel Oil #2 $7,222 732 MMBtu $9.87
TOTAL ENERGY COSTS $93,091
RECOMMENDED SAVINGS* $32,972 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,799
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ lb $ $ $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,696
Cost:
$82
$1,410 42,790 $286 35 - - - - - - - - $1,410
42,790
kWh
$286
35
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$908
Cost:
$500
$701 21,102 $207 25 - - - - - - - - $701
21,102
kWh
$207
25
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
$
03: 4.114 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS Savings:
$1,443
Cost:
$278
- - - - - - - - - - $1,443 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
$1,443
-
$
04: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$410
Cost:
$150
- - - - $410 - - - - - - - -
-
kWh
-
-
kW-months/year
$410
-
lb
-
-
$
-
-
$
-
-
$
05: 3.2121 CONVERT TO ELECTROSTATIC POWDER COATING Savings:
$27,855
Cost:
$12,000
- - - - - - $10,560 - - - $17,295 - -
-
kWh
-
-
kW-months/year
-
-
lb
$10,560
-
$
-
-
$
$17,295
-
$
06: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$578
Cost:
$30
- - - - - - - - $578 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$578
-
$
-
-
$
07: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$82
Cost:
-
- - - - - - - - $82 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$82
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$32,972
Cost:
$13,040
$2,111 63,892 $493 60 $410 - $10,560 - $660 - $18,738 - $2,111
63,892
kWh
$493
60
kW-months/year
$410
-
lb
$10,560
-
$
$660
-
$
$18,738
-
$
TOTAL IMPLEMENTED Savings:
$3,799
Cost:
$390
$1,410 42,790 $286 35 - - - - $660 - $1,443 - $1,410
42,790
kWh
$286
35
kW-months/year
-
-
lb
-
-
$
$660
-
$
$1,443
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material