IAC logo
IAC Assessment: DS0131
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0131
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1999
Principal Product Surface Analysis Equipment
NAICS n/a
SIC 3826 - Analytical Instruments
Sales $50,000,000-$100,000,000
# of Employees 330
Plant Area (Sq.Ft.) 206,000
Annual Production 75 Pieces
Production Hrs. Annual 4,940
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $134,629 4,415,299 kWh $0.03
Electricity Demand $84,381 11,352 kW-months/year $7.43
Electricity Fees $5,856 - $ -
Natural Gas $43,962 7,997 MMBtu $5.50
TOTAL ENERGY COSTS $268,825
RECOMMENDED SAVINGS* $55,770 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $569
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$95
Cost:
$216
$95 3,224 - - - - - - $95
3,224
kWh
-
-
kW-months/year
-
-
lb
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$474
Cost:
$81
$367 11,723 $107 14 - - - - $367
11,723
kWh
$107
14
kW-months/year
-
-
lb
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,201
Cost:
$2,214
$1,389 44,842 $812 109 - - - - $1,389
44,842
kWh
$812
109
kW-months/year
-
-
lb
-
-
$
04: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$3,000
Cost:
$400
- - - - $3,000 - - - -
-
kWh
-
-
kW-months/year
$3,000
-
lb
-
-
$
05: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$50,000
Cost:
$28,500
- - - - - - $50,000 - -
-
kWh
-
-
kW-months/year
-
-
lb
$50,000
-
$
TOTAL RECOMMENDED Savings:
$55,770
Cost:
$31,411
$1,851 59,789 $919 123 $3,000 - $50,000 - $1,851
59,789
kWh
$919
123
kW-months/year
$3,000
-
lb
$50,000
-
$
TOTAL IMPLEMENTED Savings:
$569
Cost:
$297
$462 14,947 $107 14 - - - - $462
14,947
kWh
$107
14
kW-months/year
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes