IAC logo
IAC Assessment: DS0132
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0132
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1999
Principal Product Corrugated Boxes
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 85
Plant Area (Sq.Ft.) 175,000
Annual Production 162,000 Thousand Feet
Production Hrs. Annual 4,290
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $62,844 2,027,843 kWh $0.03
Electricity Demand $49,027 6,720 kW-months/year $7.30
Electricity Fees $9,843 - $ -
Natural Gas $9,755 1,853 MMBtu $5.26
LPG $11,000 1,035 MMBtu $10.63
TOTAL ENERGY COSTS $71,489
RECOMMENDED SAVINGS* $27,581 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $ $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,316
Cost:
$1,705
- - - - - - $1,316 250 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,316
250
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$947
Cost:
$113
$125 40,152 $822 113 - - - - - - - - - - $125
40,152
kWh
$822
113
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$869
Cost:
$1,750
- - - - $869 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$869
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$232
Cost:
$108
$232 7,620 - - - - - - - - - - - - $232
7,620
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,274
Cost:
$2,274
$1,705 55,100 $569 78 - - - - - - - - - - $1,705
55,100
kWh
$569
78
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
06: 3.7311 MAINTAIN MACHINES TO REDUCE LEAKS Savings:
$2,049
Cost:
$52
- - - - - - - - $2,049 520 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$2,049
520
lb
-
-
$
-
-
$
07: 4.2110 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$5,579
Cost:
$2,750
- - - - - - - - - - - - $5,579 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
$5,579
-
$
08: 4.4440 INSTALL SYSTEM TO COLLECT SCRAP Savings:
$13,520
Cost:
$6,260
- - - - - - - - - - $13,520 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
$13,520
-
$
-
-
$
09: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$795
Cost:
$90
- - - - - - - - - - - - $795 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
$795
-
$
TOTAL RECOMMENDED Savings:
$27,581
Cost:
$15,102
$2,062 102,872 $1,391 191 $869 - $1,316 250 $2,049 520 $13,520 - $6,374 - $2,062
102,872
kWh
$1,391
191
kW-months/year
$869
-
$
$1,316
250
MMBtu
$2,049
520
lb
$13,520
-
$
$6,374
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes