IAC Assessment: DS0133
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0133
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1999
Principal Product Custom Commercial Cabinetry
NAICS n/a
SIC 2541 - Wood Partitions And Fixtures
Sales $10,000,000-$50,000,000
# of Employees 92
Plant Area (Sq.Ft.) 112,000
Annual Production 67 Thousand Feet
Production Hrs. Annual 5,512
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $102,226 1,683,177 kWh $0.06
Electricity Demand $39,987 6,012 kW-months/year $6.65
Electricity Fees $4,883 - $ -
Natural Gas $15,409 2,896 MMBtu $5.32
TOTAL ENERGY COSTS $191,093
RECOMMENDED SAVINGS* $18,250 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,910
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Raw Material Water Consumption Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Raw Material Water Consumption
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $ $ Tgal
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$865
Cost:
$324
$865 25,498 - - - - - - - - - - - - $865
25,498
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
-
-
Tgal
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$863
Cost:
$1,010
- - - - $863 162 - - - - - - - - -
-
kWh
-
-
kW-months/year
$863
162
MMBtu
-
-
$
-
-
$
-
-
$
-
-
Tgal
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$221
Cost:
$375
$156 4,689 $65 10 - - - - - - - - - - $156
4,689
kWh
$65
10
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
-
-
Tgal
04: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$13,380
Cost:
$3,000
- - - - - - - - - - $13,380 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
$13,380
-
$
-
-
Tgal
05: 3.4151 MINIMIZE WATER USAGE Savings:
$340
Cost:
$230
- - - - - - - - - - - - $340 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
$340
-
Tgal
06: 4.446 AUTOMATE FINISHING PROCESS Savings:
$1,925
Cost:
$4,900
- - - - - - $1,925 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,925
-
$
-
-
$
-
-
$
-
-
Tgal
07: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$656
Cost:
-
- - - - - - - - $656 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$656
-
$
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$18,250
Cost:
$9,839
$1,021 30,187 $65 10 $863 162 $1,925 - $656 - $13,380 - $340 - $1,021
30,187
kWh
$65
10
kW-months/year
$863
162
MMBtu
$1,925
-
$
$656
-
$
$13,380
-
$
$340
-
Tgal
TOTAL IMPLEMENTED Savings:
$17,910
Cost:
$9,609
$1,021 30,187 $65 10 $863 162 $1,925 - $656 - $13,380 - - - $1,021
30,187
kWh
$65
10
kW-months/year
$863
162
MMBtu
$1,925
-
$
$656
-
$
$13,380
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Raw Material Water Consumption Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Primary Raw Material Water Consumption