IAC logo
IAC Assessment: DS0134
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0134
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1999
Principal Product Corrugated Shipping Containers and Displays
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 150,000
Annual Production 216,000 Thousand Feet
Production Hrs. Annual 5,720
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $56,327 1,817,702 kWh $0.03
Electricity Demand $40,564 5,484 kW-months/year $7.40
Electricity Fees $8,746 - $ -
Natural Gas $6,731 1,219 MMBtu $5.52
LPG $9,600 2,220 MMBtu $4.32
TOTAL ENERGY COSTS $95,940
RECOMMENDED SAVINGS* $14,751 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,318
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,978
Cost:
$161
$1,983 63,892 $995 134 - - - - - - $1,983
63,892
kWh
$995
134
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,209
Cost:
$1,750
- - - - $1,209 - - - - - -
-
kWh
-
-
kW-months/year
$1,209
-
$
-
-
MMBtu
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$885
Cost:
$625
$592 19,050 $293 40 - - - - - - $592
19,050
kWh
$293
40
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$787
Cost:
$1,551
- - - - - - $787 143 - - -
-
kWh
-
-
kW-months/year
-
-
$
$787
143
MMBtu
-
-
$
05: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$455
Cost:
$240
- - - - - - - - $455 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$455
-
$
06: 4.211 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$8,437
Cost:
$1,350
- - - - - - - - $8,437 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$8,437
-
$
TOTAL RECOMMENDED Savings:
$14,751
Cost:
$5,677
$2,575 82,942 $1,288 174 $1,209 - $787 143 $8,892 - $2,575
82,942
kWh
$1,288
174
kW-months/year
$1,209
-
$
$787
143
MMBtu
$8,892
-
$
TOTAL IMPLEMENTED Savings:
$4,318
Cost:
$1,026
$2,575 82,942 $1,288 174 - - - - $455 - $2,575
82,942
kWh
$1,288
174
kW-months/year
-
-
$
-
-
MMBtu
$455
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes