Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1999
Principal Product Fabricated Aluminum Parts
NAICS n/a
SIC 3449 - Miscellaneous Metal Work
Sales $5,000,000-$10,000,000
# of Employees 125
Plant Area (Sq.Ft.) 45,750
Annual Production 360,000 Pieces
Production Hrs. Annual 5,460
Location (State) SD
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $57,213 2,147,128 kWh $0.03
Electricity Demand $31,062 4,668 kW-months/year $6.65
Electricity Fees $2,767 - $ -
Natural Gas $5,001 1,027 MMBtu $4.87
LPG $477 20 MMBtu $23.85
TOTAL ENERGY COSTS $(-74,047)
RECOMMENDED SAVINGS* $6,910 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,613
Cost:
$1,613
$1,179 43,669 $1,341 202 $(-907) (-186) - - - - - - $1,179
43,669
kWh
$1,341
202
kW-months/year
$(-907)
(-186)
MMBtu
-
-
Tgal
-
-
$
-
-
$
02: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$676
Cost:
$400
- - - - - - $676 337,800 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$676
337,800
Tgal
-
-
$
-
-
$
03: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$3,900
Cost:
$1,000
- - - - - - - - - - $3,900 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$3,900
-
$
04: 4.211 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$721
Cost:
$1,811
- - - - - - - - $552 - $169 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$552
-
$
$169
-
$
TOTAL RECOMMENDED Savings:
$6,910
Cost:
$4,824
$1,179 43,669 $1,341 202 $(-907) (-186) $676 337,800 $552 - $4,069 - $1,179
43,669
kWh
$1,341
202
kW-months/year
$(-907)
(-186)
MMBtu
$676
337,800
Tgal
$552
-
$
$4,069
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Primary Raw Material