IAC Assessment: DS0143
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0143
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1999
Principal Product Heat Transfer Products
NAICS n/a
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 128,150
Annual Production 410,000 Pieces
Production Hrs. Annual 4,576
Location (State) SD
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $276,835 7,956,624 kWh $0.03
Electricity Demand $164,106 18,240 kW-months/year $9.00
Electricity Fees $17,638 - $ -
Natural Gas $225,175 76,453 MMBtu $2.95
LPG $11,700 2,484 MMBtu $4.71
TOTAL ENERGY COSTS $634,382
RECOMMENDED SAVINGS* $65,611 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,060
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$800
Cost:
$135
$476 13,482 $324 36 - - - - - - $476
13,482
kWh
$324
36
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,177
Cost:
$7,500
- - - - $4,177 1,416 - - - - -
-
kWh
-
-
kW-months/year
$4,177
1,416
MMBtu
-
-
lb
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,280
Cost:
$2,400
$1,362 38,980 $918 102 - - - - - - $1,362
38,980
kWh
$918
102
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$16,788
Cost:
$3,567
$7,002 200,176 - - $9,786 3,317 - - - - $7,002
200,176
kWh
-
-
kW-months/year
$9,786
3,317
MMBtu
-
-
lb
-
-
$
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$16,588
Cost:
$20
$4,930 140,973 - - $11,658 3,952 - - - - $4,930
140,973
kWh
-
-
kW-months/year
$11,658
3,952
MMBtu
-
-
lb
-
-
$
06: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$16,043
Cost:
$640
$9,563 273,447 $6,480 720 - - - - - - $9,563
273,447
kWh
$6,480
720
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
07: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$8,760
Cost:
$90
- - - - - - $8,760 96,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$8,760
96,000
lb
-
-
$
08: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$175
Cost:
-
- - - - - - - - $175 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$175
-
$
TOTAL RECOMMENDED Savings:
$65,611
Cost:
$14,352
$23,333 667,058 $7,722 858 $25,621 8,685 $8,760 96,000 $175 - $23,333
667,058
kWh
$7,722
858
kW-months/year
$25,621
8,685
MMBtu
$8,760
96,000
lb
$175
-
$
TOTAL IMPLEMENTED Savings:
$32,060
Cost:
$10,765
$11,401 325,909 $7,722 858 $4,177 1,416 $8,760 96,000 - - $11,401
325,909
kWh
$7,722
858
kW-months/year
$4,177
1,416
MMBtu
$8,760
96,000
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes