Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | South Dakota State |
---|---|
Assessment Year | 1999 |
Principal Product | Heat Transfer Products |
NAICS | n/a |
SIC | 3443 - Fabricated Plate Work (boiler Shops) |
Sales | $10,000,000-$50,000,000 |
# of Employees | 300 |
Plant Area (Sq.Ft.) | 128,150 |
Annual Production | 410,000 Pieces |
Production Hrs. Annual | 4,576 |
Location (State) | SD |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $276,835 | 7,956,624 | kWh | $0.03 |
Electricity Demand | $164,106 | 18,240 | kW-months/year | $9.00 |
Electricity Fees | $17,638 | - | $ | - |
Natural Gas | $225,175 | 76,453 | MMBtu | $2.95 |
LPG | $11,700 | 2,484 | MMBtu | $4.71 |
TOTAL ENERGY COSTS | $634,382 | |||
RECOMMENDED SAVINGS* | $65,611 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $32,060 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $800 Cost: $135 |
$476 | 13,482 | $324 | 36 | - | - | - | - | - | - |
$476 13,482 kWh |
$324 36 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $4,177 Cost: $7,500 |
- | - | - | - | $4,177 | 1,416 | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,177 1,416 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,280 Cost: $2,400 |
$1,362 | 38,980 | $918 | 102 | - | - | - | - | - | - |
$1,362 38,980 kWh |
$918 102 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $16,788 Cost: $3,567 |
$7,002 | 200,176 | - | - | $9,786 | 3,317 | - | - | - | - |
$7,002 200,176 kWh |
- - kW-months/year |
$9,786 3,317 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $16,588 Cost: $20 |
$4,930 | 140,973 | - | - | $11,658 | 3,952 | - | - | - | - |
$4,930 140,973 kWh |
- - kW-months/year |
$11,658 3,952 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $16,043 Cost: $640 |
$9,563 | 273,447 | $6,480 | 720 | - | - | - | - | - | - |
$9,563 273,447 kWh |
$6,480 720 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $8,760 Cost: $90 |
- | - | - | - | - | - | $8,760 | 96,000 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$8,760 96,000 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE |
Savings: $175 Cost: - |
- | - | - | - | - | - | - | - | $175 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$175 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $65,611 Cost: $14,352 |
$23,333 | 667,058 | $7,722 | 858 | $25,621 | 8,685 | $8,760 | 96,000 | $175 | - | $23,333 667,058 kWh |
$7,722 858 kW-months/year |
$25,621 8,685 MMBtu |
$8,760 96,000 lb |
$175 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $32,060 Cost: $10,765 |
$11,401 | 325,909 | $7,722 | 858 | $4,177 | 1,416 | $8,760 | 96,000 | - | - | $11,401 325,909 kWh |
$7,722 858 kW-months/year |
$4,177 1,416 MMBtu |
$8,760 96,000 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Administrative Changes |