IAC logo
IAC Assessment: DS0144
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0144
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1999
Principal Product Metal Stampings
NAICS n/a
SIC 3469 - Metal Stampings, Nec
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 120,000
Annual Production 11,087,500 Pieces
Production Hrs. Annual 4,485
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $83,583 2,405,041 kWh $0.03
Electricity Demand $43,337 6,420 kW-months/year $6.75
Electricity Fees $2,227 - $ -
Natural Gas $18,668 3,890 MMBtu $4.80
LPG $3,953 287 MMBtu $13.77
TOTAL ENERGY COSTS $(-7,094)
RECOMMENDED SAVINGS* $9,820 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,797
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ gal $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,077
Cost:
$438
$2,032 58,030 $1,045 155 - - - - - - $2,032
58,030
kWh
$1,045
155
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$567
Cost:
$259
$373 10,551 $194 29 - - - - - - $373
10,551
kWh
$194
29
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$705
Cost:
$216
$705 20,223 - - - - - - - - $705
20,223
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,642
Cost:
$725
$1,642 46,893 - - - - - - - - $1,642
46,893
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
05: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$1,318
Cost:
$1,695
- - - - $148 31 $1,170 220 - - -
-
kWh
-
-
kW-months/year
$148
31
MMBtu
$1,170
220
gal
-
-
$
06: 4.211 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$2,225
Cost:
$1,350
- - - - - - - - $2,225 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$2,225
-
$
07: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$286
Cost:
-
- - - - - - - - $286 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$286
-
$
TOTAL RECOMMENDED Savings:
$9,820
Cost:
$4,683
$4,752 135,697 $1,239 184 $148 31 $1,170 220 $2,511 - $4,752
135,697
kWh
$1,239
184
kW-months/year
$148
31
MMBtu
$1,170
220
gal
$2,511
-
$
TOTAL IMPLEMENTED Savings:
$7,797
Cost:
$2,772
$4,047 115,474 $1,239 184 - - - - $2,511 - $4,047
115,474
kWh
$1,239
184
kW-months/year
-
-
MMBtu
-
-
gal
$2,511
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Administrative Changes