IAC logo
IAC Assessment: DS0146
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0146
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1999
Principal Product Sodium Hyaluronate
NAICS n/a
SIC 2833 - Medicinals And Botanicals
Sales $10,000,000-$50,000,000
# of Employees 142
Plant Area (Sq.Ft.) 150,560
Annual Production 1,069 Pounds
Production Hrs. Annual 6,240
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $176,191 6,184,056 kWh $0.03
Electricity Demand $107,530 13,260 kW-months/year $8.11
Electricity Fees $5,465 - $ -
Natural Gas $76,578 25,323 MMBtu $3.02
Fuel Oil #6 $2,275 525 MMBtu $4.33
TOTAL ENERGY COSTS $423,771
RECOMMENDED SAVINGS* $26,758 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,928
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,610
Cost:
$5,010
- - - - $1,610 533 - - - - -
-
kWh
-
-
kW-months/year
$1,610
533
MMBtu
-
-
lb
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$440
Cost:
$540
$440 15,240 - - - - - - - - $440
15,240
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$561
Cost:
$364
$366 12,603 $195 24 - - - - - - $366
12,603
kWh
$195
24
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,488
Cost:
$856
- - - - $2,488 824 - - - - -
-
kWh
-
-
kW-months/year
$2,488
824
MMBtu
-
-
lb
-
-
$
05: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$16,231
Cost:
$8,361
$4,905 169,109 $4,379 540 $6,947 2,300 - - - - $4,905
169,109
kWh
$4,379
540
kW-months/year
$6,947
2,300
MMBtu
-
-
lb
-
-
$
06: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$1,235
Cost:
$2,407
- - - - $1,235 409 - - - - -
-
kWh
-
-
kW-months/year
$1,235
409
MMBtu
-
-
lb
-
-
$
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$1,185
Cost:
$4,480
- - - - - - $1,185 24,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,185
24,000
lb
-
-
$
08: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$3,008
Cost:
$240
- - - - - - - - $3,008 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$3,008
-
$
TOTAL RECOMMENDED Savings:
$26,758
Cost:
$22,258
$5,711 196,952 $4,574 564 $12,280 4,066 $1,185 24,000 $3,008 - $5,711
196,952
kWh
$4,574
564
kW-months/year
$12,280
4,066
MMBtu
$1,185
24,000
lb
$3,008
-
$
TOTAL IMPLEMENTED Savings:
$2,928
Cost:
$1,396
$440 15,240 - - $2,488 824 - - - - $440
15,240
kWh
-
-
kW-months/year
$2,488
824
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes