IAC Assessment: DS0147
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0147
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1999
Principal Product Valves and Regulators
NAICS n/a
SIC 3491 - Industrial Valves
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 41,000
Annual Production 26,000 Pieces
Production Hrs. Annual 4,160
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $99,992 2,419,695 kWh $0.04
Electricity Demand $38,094 5,688 kW-months/year $6.70
Electricity Fees $336 - $ -
Natural Gas $6,289 1,254 MMBtu $5.02
TOTAL ENERGY COSTS $157,268
RECOMMENDED SAVINGS* $10,006 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$4,412
Cost:
$3,358
$2,313 56,565 - - $2,099 418 - - - - - - $2,313
56,565
kWh
-
-
kW-months/year
$2,099
418
MMBtu
-
-
Tgal
-
-
gal
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$301
Cost:
$343
$205 4,982 $96 14 - - - - - - - - $205
4,982
kWh
$96
14
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$635
Cost:
$1,156
$635 28,722 - - - - - - - - - - $635
28,722
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,400
Cost:
$4,365
$1,266 30,774 $796 119 $(-662) 132 - - - - - - $1,266
30,774
kWh
$796
119
kW-months/year
$(-662)
132
MMBtu
-
-
Tgal
-
-
gal
-
-
$
05: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$857
Cost:
$1,695
$174 10,258 - - - - - - $683 248 - - $174
10,258
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$683
248
gal
-
-
$
06: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE Savings:
$1,498
Cost:
$2,832
- - - - - - $1,498 1,497,600 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,498
1,497,600
Tgal
-
-
gal
-
-
$
07: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$903
Cost:
-
- - - - - - - - - - $903 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
$903
-
$
TOTAL RECOMMENDED Savings:
$10,006
Cost:
$13,749
$4,593 131,301 $892 133 $1,437 550 $1,498 1,497,600 $683 248 $903 - $4,593
131,301
kWh
$892
133
kW-months/year
$1,437
550
MMBtu
$1,498
1,497,600
Tgal
$683
248
gal
$903
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Administrative Changes