IAC logo
IAC Assessment: DS0149
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DS0149
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center South Dakota State
Assessment Year 1999
Principal Product Thermoset and Thermo-Plastic molding
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 68,124
Annual Production 95,000,000 Pieces
Production Hrs. Annual 8,424
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $211,899 5,257,913 kWh $0.04
Electricity Demand $28,419 11,568 kW-months/year $2.46
Electricity Fees $7,571 - $ -
Natural Gas $7,709 1,563 MMBtu $4.93
TOTAL ENERGY COSTS $283,788
RECOMMENDED SAVINGS* $45,971 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$862
Cost:
$319
$776 19,050 $86 28 - - - - - - $776
19,050
kWh
$86
28
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,856
Cost:
$950
- - - - $1,856 377 - - - - -
-
kWh
-
-
kW-months/year
$1,856
377
MMBtu
-
-
lb
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,335
Cost:
$383
$2,108 51,290 $227 73 - - - - - - $2,108
51,290
kWh
$227
73
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,933
Cost:
$1,919
$3,933 95,838 - - - - - - - - $3,933
95,838
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$7,000
Cost:
$400
- - - - - - $1,300 34,000 $5,700 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,300
34,000
lb
$5,700
-
$
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$3,781
Cost:
$4,480
- - - - - - $3,781 68,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,781
68,000
lb
-
-
$
07: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$10,104
Cost:
$3,000
- - - - - - - - $10,104 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$10,104
-
$
08: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$14,600
Cost:
$7,275
- - - - - - - - $14,600 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$14,600
-
$
09: 4.2110 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$1,500
Cost:
$400
- - - - - - - - $1,500 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$1,500
-
$
TOTAL RECOMMENDED Savings:
$45,971
Cost:
$19,126
$6,817 166,178 $313 101 $1,856 377 $5,081 102,000 $31,904 - $6,817
166,178
kWh
$313
101
kW-months/year
$1,856
377
MMBtu
$5,081
102,000
lb
$31,904
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes