Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | South Dakota State |
---|---|
Assessment Year | 2000 |
Principal Product | Thermal-formed trays |
NAICS | n/a |
SIC | 3089 - Plastics Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 140 |
Plant Area (Sq.Ft.) | 77,000 |
Annual Production | 1,220,259 Pounds |
Production Hrs. Annual | 6,240 |
Location (State) | MN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $123,489 | 3,984,760 | kWh | $0.03 |
Electricity Demand | $84,200 | 11,112 | kW-months/year | $7.58 |
Electricity Fees | $25,875 | - | $ | - |
Natural Gas | $25,268 | 4,860 | MMBtu | $5.20 |
LPG | $700 | 56 | MMBtu | $12.50 |
TOTAL ENERGY COSTS | $(-689,789) | |||
RECOMMENDED SAVINGS* | $75,292 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $3,545 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $3,708 Cost: $1,337 |
- | - | - | - | $3,708 | 713 | - | - | - | - |
- - kWh |
- - $ |
$3,708 713 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $725 Cost: $96 |
$725 | 23,447 | - | - | - | - | - | - | - | - |
$725 23,447 kWh |
- - $ |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $1,540 Cost: $2,100 |
- | - | $1,540 | - | - | - | - | - | - | - |
- - kWh |
$1,540 - $ |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $2,005 Cost: $330 |
- | - | - | - | $2,005 | 386 | - | - | - | - |
- - kWh |
- - $ |
$2,005 386 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $832 Cost: $4,230 |
- | - | - | - | - | - | $832 | 27,600 | - | - |
- - kWh |
- - $ |
- - MMBtu |
$832 27,600 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.425 ELIMINATE/REDUCE REDUNDANT INSPECTIONS |
Savings: $66,482 Cost: $72,000 |
- | - | - | - | - | - | - | - | $66,482 | - |
- - kWh |
- - $ |
- - MMBtu |
- - lb |
$66,482 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $75,292 Cost: $80,093 |
$725 | 23,447 | $1,540 | - | $5,713 | 1,099 | $832 | 27,600 | $66,482 | - | $725 23,447 kWh |
$1,540 - $ |
$5,713 1,099 MMBtu |
$832 27,600 lb |
$66,482 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $3,545 Cost: $2,430 |
- | - | $1,540 | - | $2,005 | 386 | - | - | - | - | - - kWh |
$1,540 - $ |
$2,005 386 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Personnel Changes |